Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, December 13, 1994--March 12, 1995


Book Description

Results are presented concerning reservoir performance analysis and effectiveness of hydraulic fracture treatments. A geostatistical analysis task, reservoir simulation, and integrated reservoir description tasks are also described.







Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, September 13, 1995--December 12, 1995


Book Description

The main emphasis this quarter was on the geostatistics and reservoir simulation. Assimilation of data with the geostatistics was conducted to determine the specific well locations for the demonstration program. Reservoir characterization and performance information is also included.




Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, September 13--December 12, 1996


Book Description

Eighteen 10-acre infill wells have been drilled and completed as part of the Field Demonstration phase of the project at the North Robertson (Clearfork) Unit (NRU). The fourteen producing wells are pumped-off and producing at stable rates. The four injection wells are completed and have been on injection for three to four weeks. Current Unit production is approximately 3,400 STBO/D, of which approximately 900 STBO/D is being produced from the 10-acre infill wells. A change in the Statement of Work has been approved so that additional 10-acre infill wells can be drilled and/or 20-acre producing wells can be converted to injection during the next quarter as budget constraints and rig availability allow. Technical progress is described for the quarter in many related areas: implementation of the field demonstration; reservoir characterization; reservoir management activities and performance analysis; reservoir simulation; and technology transfer.







Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Progress Report, June 13, 1995--September 12, 1995


Book Description

At this stage of the reservoir characterization research, the main emphasis is on the geostatistics and reservoir simulation. Progress is reported on geological analysis, reservoir simulation, and reservoir management.







Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, December 13, 1995--March 12, 1996


Book Description

This project has used a multi-disciplinary approach employing geology, geophysics, and engineering to conduct advanced reservoir characterization and management activities to design and implement an optimized infill drilling program at the North Robertson Unit. The activities during the first Budget Period, which is now complete, consisted of developing an integrated reservoir description from geological, engineering, and geostatistical studies, and using this description for reservoir flow simulation. Specific reservoir management activities have been identified and tested. The geologically targeted infill drilling program to be implemented during Budget Period II is a result of this work.




Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling. Quarterly Technical Progress Report, March 13, 1996--June 12, 1996


Book Description

At this stage, the main emphasis is on the Field Demonstration phase of the project. The drilling portion of the Field Demonstration has been divided into two separate phases. We are currently proceeding with the drilling and completion of the first eleven Phase I wells. Locations for the additional seven Phase III wells were chosen at a Technical Committee meeting during the first week of June. Preliminary results have been very encouraging as all the wells are producing at or above their forecasted rates. Phase I includes the drilling of four producers and one injection well (10-acre nominal spacing) in both the Section 329 study area and the Section 326/327 study area, as well as one producing well in Section 362. Phase I will be completed during the first week of July. Phase II drilling will involve the completion of the waterflood patterns to the west of the Phase I areas in Sections 329 and 327, consisting of two producers and one injection well in each area. The final Phase II well will be located near the southwest corner of Section 324, in an area of the Unit that remains relatively undrained. Producer-injection well conversions will be performed in this area, as well as other peripheral areas of the Unit to add needed water injection.