Conditions of Contract for Design-build and Turnkey


Book Description

The terms of the Conditions of Contract for Design - Build and Turnkey have been prepared by the Federation Internationale des Ingenieurs Conseils (FIDIC) and are recommended for general use for the purpose of the design and construction of works where tenders are invited on an international basis; with minor modifications, the Conditions are also suitable for use on domestic contracts.




FIDIC Silver Book


Book Description




Understanding and Negotiating Turnkey and EPC Contracts


Book Description

This work aims to keep criminal lawyers up to date with the latest cases and legislation, and includes longer articles analyzing current trends and important changes in the law. Drawing all aspects of the law together in one regular publication, it allows quick and easy reference




The FIDIC Contracts Guide


Book Description




Design-build Contracting Handbook


Book Description

Covering all aspects of the design-build delivery system, this valuable guide presents the pros and cons and compares them with the traditional project delivery method. You'll learn how to easily navigate the thicket of licensing considerations, evaluate bonding and insurance implications, and analyze the performance guarantees of the design-build concept. You also get practical suggestions for effective drafting of design-build contracts.







FIDIC - A Guide for Practitioners


Book Description

In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 ‘‘Orange Book’’). These conditions, known as the ‘‘FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employer’s Representative as one of the parties.




An Employer's and Engineer's Guide to the FIDIC Conditions of Contract


Book Description

When all parties involved in the construction process fully understand their roles and are able to anticipate potential points of conflict, disputes and delays will be minimised. The Employer’s and Engineer’s Guide to the FIDIC Conditions of Contract sets out the essential administrative requirements of a FIDIC based contract by reference to the FIDIC 1999 Red Book. The obligations and duties of the Employer and the Engineer are identified and discussed. Potential pitfalls are highlighted and likely consequences pointed out. The importance of the Employer’s role in the preparation of tenders, which fully reflect his requirements and duties and obligations arising in the execution of the works, is emphasised. The key role of the Engineer in the effective administration of contracts after award is examined and commentary provided. Included in the guide are a number of appendices, including model letters which will be of value to less experienced staff (particularly those whose mother-tongue is not the English language). Engineers, quantity surveyors and project managers engaged in the contractual administration of international projects using FIDIC forms of contract will find the concise guidance in simple and jargon-free language provided here invaluable. This, together with the author’s earlier book, Contractor’s Guide to the FIDIC Conditions of Contract - which describes the duties, rights and responsibilities of the Contractor – represents the totality of supervision, design and execution of construction projects executed under the FIDIC Conditions of Contract. This book’s companion website offers invaluable resources to freely download, adapt and use: Model letters for use by the Employer Model letters for use by the Contractor Sample Interim Payment Certificate Model Form for Submissions to the Engineer Model Form of Engineer’s Order for Varied Works Model Form of Daywork/Daily Record Sheets




A Contractor's Guide to the FIDIC Conditions of Contract


Book Description

This guide will help the contractor’s staff overcome some of the difficulties encountered on a typical international contract using FIDIC forms. The majority of FIDIC-based contracts use the Red Book (Conditions of Contract for Construction), so this book concentrates on the use of those particular forms. Supplementary comments are included in Appendix C for the Yellow Book (Plant & Design-Build) recommended for use where the contractor has a design responsibility. The Contractor is represented on site by the Contractor’s Representative who carries the overall responsibility for all the Contractor’s on-site activities. In order to provide guidance to the Contractor’s Representative and his staff, this book is divided into five sections: A summarized general review of the Red Book from the Contractor’s perspective. A review of the activities and duties of the Contractor’s Representative in the same clause sequencing as they appear in the Red Book. A summary of these activities and duties but arranged in order of their likely time sequence on site. This has the added intention of providing the Contractor’s Representative with a means of ensuring that documents are not only properly provided to the Employer and Engineer, but most importantly that they are provided within the time limits specified in the Contract. A selection of model letters is provided which make reference to the various clauses of the contract requiring the Contractor to make submissions to the Employer or Engineer. Various appendices. The guide is not intended to be a review of the legal aspects of FIDIC- based contracts; legal advice should be obtained as and when necessary, particularly if the Contractor has little or no knowledge of the local law. Armed on site with a copy of The Contractor and the FIDIC Contract, the Contractor’s Representative will be more able to avoid contractual problems rather than spend considerable time and energy resolving those problems once they have arisen.