Early Site Permit (ESP) at the Exelon ESP Site
Author :
Publisher :
Page : 504 pages
File Size : 39,90 MB
Release : 2006
Category :
ISBN :
Author :
Publisher :
Page : 504 pages
File Size : 39,90 MB
Release : 2006
Category :
ISBN :
Author :
Publisher :
Page : 876 pages
File Size : 44,62 MB
Release : 2011
Category :
ISBN :
Author : U.S. Nuclear Regulatory Commission
Publisher :
Page : 706 pages
File Size : 35,10 MB
Release : 2008
Category : Nuclear energy
ISBN :
Author :
Publisher :
Page : 812 pages
File Size : 14,74 MB
Release : 2001
Category :
ISBN :
Author :
Publisher :
Page : 318 pages
File Size : 24,61 MB
Release : 2003
Category : Nuclear energy
ISBN :
Author : U.s. Nuclear Reglatory Commission
Publisher : CreateSpace
Page : 502 pages
File Size : 30,49 MB
Release : 2014-06-14
Category : Technology & Engineering
ISBN : 9781500203016
This environmental impact statement (EIS) has been prepared in response to an application submitted to the U.S. Nuclear Regulatory Commission (NRC) by Exelon Generation Company, LLC (Exelon) for an early site permit (ESP). The proposed action requested in Exelon's application is for the NRC to (1) approve a site within the existing Clinton Power Station (CPS) boundaries as suitable for the construction and operation of a new nuclear power generating facility and (2) issue an ESP for the proposed site identified as the Exelon ESP site located adjacent to the CPS. In its application, Exelon proposes a plan for redressing the environmental effects of certain site-preparation and construction activities, i.e., those activities allowed by Title 10 of the Code of Federal Regulations (CFR) 50.10(e)(1), performed by an ESP holder under 10 CFR 52.25. In accordance with the plan, the site would be redressed if the NRC issues the requested ESP (containing the site redress plan), the ESP holder performs these site-preparation and construction activities, the ESP is not referenced in an application for a construction permit or combined operating license, and no alternative use is found for the site. This EIS includes the NRC staff's analysis that considers and weighs the environmental impacts of constructing and operating a new nuclear unit at the Exelon ESP site or at alternative sites, and mitigation measures available for reducing or avoiding adverse impacts. It also includes the staff's recommendation to the Commission regarding the proposed action.
Author :
Publisher :
Page : 236 pages
File Size : 15,83 MB
Release : 2012-10
Category : Delegated legislation
ISBN :
Author : Kenneth D. Kok
Publisher : CRC Press
Page : 978 pages
File Size : 39,14 MB
Release : 2016-10-03
Category : Science
ISBN : 1482215934
Building upon the success of the first edition, the Nuclear Engineering Handbook, Second Edition, provides a comprehensive, up-to-date overview of nuclear power engineering. Consisting of chapters written by leading experts, this volume spans a wide range of topics in the areas of nuclear power reactor design and operation, nuclear fuel cycles, and radiation detection. Plant safety issues are addressed, and the economics of nuclear power generation in the 21st century are presented. The Second Edition also includes full coverage of Generation IV reactor designs, and new information on MRS technologies, small modular reactors, and fast reactors.
Author : U.s. Nuclear Reglatory Commission
Publisher : CreateSpace
Page : 498 pages
File Size : 38,14 MB
Release : 2014-06-14
Category : Technology & Engineering
ISBN : 9781500203030
This environmental impact statement (EIS) has been prepared in response to an application submitted to the U.S. Nuclear Regulatory Commission (NRC) by Exelon Generation Company, LLC (Exelon) for an early site permit (ESP). The proposed action requested in Exelon's application is for the NRC to (1) approve a site within the existing Clinton Power Station (CPS) boundaries as suitable for the construction and operation of a new nuclear power generating facility and (2) issue an ESP for the proposed site identified as the Exelon ESP site located adjacent to the CPS. In its application, Exelon proposes a plan for redressing the environmental effects of certain site-preparation and construction activities, i.e., those activities allowed by Title 10 of the Code of Federal Regulations (CFR) 50.10(e)(1), performed by an ESP holder under 10 CFR 52.25. In accordance with the plan, the site would be redressed if the NRC issues the requested ESP (containing the site redress plan), the ESP holder performs these site-preparation and construction activities, the ESP is not referenced in an application for a construction permit or combined operating license, and no alternative use is found for the site. This EIS includes the NRC staff's analysis that considers and weighs the environmental impacts of constructing and operating a new nuclear unit at the Exelon ESP site or at alternative sites, and mitigation measures available for reducing or avoiding adverse impacts. It also includes the staff's recommendation to the Commission regarding the proposed action.
Author :
Publisher :
Page : 788 pages
File Size : 43,23 MB
Release : 2009
Category : Nuclear energy
ISBN :