I Have a Dog


Book Description

I have a dog. An inconvenient dog. When I wake up, my dog is inconvenient. When I'm getting dressed, my dog is inconvenient. And when I'm making tunnels, my dog is SUPER inconvenient. But sometimes, an inconvenient dog can be big and warm and cuddly. Sometimes, an inconvenient dog can be the most comforting friend in the whole wide world.




The Dare


Book Description

Jessica Martin is not a nice girl. As Prom Queen and Captain of the cheer squad, she'd ruled her school mercilessly, looking down her nose at everyone she deemed unworthy. The most unworthy of them all? The "freak," Manson Reed: her favorite victim. But a lot changes after high school. A freak like him never should have ended up at the same Halloween party as her. He never should have been able to beat her at a game of Drink or Dare. He never should have been able to humiliate her in front of everyone. Losing the game means taking the dare: a dare to serve Manson for the entire night as his slave. It's a dare that Jessica's pride - and curiosity - won't allow her to refuse. What ensues is a dark game of pleasure and pain, fear and desire. Is it only a game? Only revenge? Only a dare? Or is it something more? The Dare is an 18+ erotic romance novella and a prequel to the Losers Duet. Reader discretion is strongly advised. This book contains graphic sexual scenes, intense scenes of BDSM, and strong language. A full content note can be found in the front matter of the book.







Draft Environmental Impact Statement for the Ulysses Mission (Tier 2)


Book Description

This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Ulysses spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special(PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG). The potential effects considered in this EIS include risks of air and water quality impacts, local land area contamination, adverse health and safety impacts, the disturbance of biotic resources, impacts on wetland areas or areas containing historical sites, and socioeconomic impacts. Intensive analysis of the possible accidents associated with the proposed action are underway and preliminary results indicate small health or environmental risks. The results of a Final Safety Analysis Report will be available for inclusion into the final EIS. Unspecified Cent...










Final Environmental Impact Statement


Book Description




Final Environmental Impact Statement


Book Description