Genesee River Basin Study. Volume 2. Supporting Documentation


Book Description

The Feasibility Report discusses plans considered under the Genesee River Basin Study Authority. Two of these plans: a multi-use reservoir at Standards and modification to the existing Mt. Morris Dam and reservoir for multi-use including flood control, recreation, hydropower, and irrigation. These plans were found not economically feasible for single-purpose flood control. The Federal Government therefore recommended no further Federal actions. Keywords: Hydrology, Hydraulics, Environmental coordination. (kr).




Genesee River Basin Study; Reconnaissance Report. Volume 2. Supporting Documentation


Book Description

Contents: Basin Description; Historical Floods; Floodprone Areas; Gaging Stations; Future Floods; Flood Probabilities; Dams and Reservoirs; Flood Damages; Reservoir Scenarios; Hydropower; Canaseraga Creek; Genesee River Streambank; Rating and Stage Damage Curves; Plates.













Genesee River Basin Study. Volume 1. Main Report


Book Description

This feasibility report discusses plans considered under the Genesee River Basin Study Authority. Two of these plans--a multi-use reservoir at Stannards and modification to the existing Mt. Morris Dam and reservoir for multi-use including flood control, recreation, hydropower, and irrigation--were found not economically feasible for single-purpose flood control. The Federal Government therefore recommended no further Federal actions.




Genesee River Basin


Book Description




Genesee River Basin Study


Book Description