Navy Virginia Class Attack Submarine Procurement


Book Description

The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25 and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.




Navy Virginia Class Attack Submarine Procurement


Book Description

The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25th and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.




Navy Virginia (Ssn-774) Class Attack Submarine Procurement


Book Description

This report provides background information and issues for Congress on the Virginia-class nuclear-powered attack submarine (SSN) program. The Navy's proposed FY2014 budget requested $5,285.3 million in procurement and advance procurement (AP) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.




Navy Submarines


Book Description

The U.S. Navy operates three types of submarines- nuclear-powered ballistic missile submarines (SSBNs), nuclear-powered cruise missile and special operations forces (SOF) submarines (SSGNs), and nuclear-powered attack submarines (SSNs). This book provides background information and issues for Congress on the Virginia-class SSN program. The Navy's proposed FY2016 budget requests $5,340.1 million in procurement, advance procurement (AP), and Economic Order Quantity (EOQ) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. Furthermore, this book provides background information and potential oversight issues for Congress on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Ohio replacement program is also known as the SSBN(X) program. The Navy wants to procure the first Ohio replacement boat in FY2021, with advance procurement (AP) funding starting in FY2017. The Navy has identified the Ohio replacement program as its top priority program.




Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program


Book Description

The Columbia (SSBN-826) class program is a program to design and build a class of 12 new ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 aging Ohio-class SSBNs. The Navy has identified the Columbia-class program as the Navy's top priority program. The Navy wants to procure the first Columbia-class boat in FY2021. Research and development work on the program has been underway for several years, and advance procurement (AP) funding for the program began in FY2017. The Navy's proposed FY2020 budget requests $1,698.9 million in advance procurement (AP) funding and $533.1 million in research and development funding for the program. The Navy's FY2020 budget submission estimates the total procurement cost of the 12-ship class at $109.0 billion in then-year dollars. An April 2018 Government Accountability Office (GAO) report assessing selected major DOD weapon acquisition programs stated that the estimated total acquisition cost of the Columbia-class program is $102,075.3 million (about $102.1 billion) in constant FY2018 dollars, including $12,901.0 million (about $12.9 billion) in research and development costs and $89,174.3 million (about $89.2 billion) in procurement costs.




Navy Force Structure and Shipbuilding Plans


Book Description

Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.




Astute Class Nuclear Submarine Owners' Workshop Manual


Book Description

The Astute-class is the largest, most advanced and most powerful attack submarine ever operated by the Royal Navy, combining world-leading sensors, design and weaponry in a versatile vessel. The submarines are nuclear-propelled and fuelled by a nuclear reactor powerful enough to supply a city the size of Southampton. Its advanced technology means the submarines will never need to be refuelled. They employ the latest technology such as the Sonar 2076 that detects the sound of enemy submarines using the largest number of hydrophones ever fitted to a submarine. Linked with powerful onboard electronics these provide the submarines with outstanding sensitivity. The Astute submarines are armed with the latest versions of Spearfish heavy-weight torpedoes and Tomahawk land-attack cruise missiles.




Navy Attack Submarine Procurement


Book Description

Contents: (1) Intro.; (2) Background: Types of Sub¿s. in the U.S. Navy; Attack Sub. Force Levels; Virginia (SSN-774) Class Program; Past and Planned Procurement; Changes in Planned Procurement Rates; Joint Production Arrangement; Cost-Reduction Effort; Sub Construction Industrial Base; Design and Engin. (D&E) Portion; Projected SSN Shortfall; Navy Study on Options for Mitigating Projected Shortfall; (3) Issues for Congress: 48-Boat Force-Level Goal and Planned SSN Procurement; (4) Options for Congress; (5) Legislative Activity for FY 2010. Appendices: Past SSN Force-Level Goals; Views Regarding 48-Boat SSN Force-Level Goal; Options for Funding SSNs; Maintaining Sub. D&E Base. A print on demand pub.




Navy Attack Submarine Procurement: Background and Issues for Congress


Book Description

The Navy's proposed FY2009 budget requests $2,107.0 million to complete the procurement funding for an 11th Virginia (SSN-774) class nuclear-powered attack submarine (SSN). This boat has already received $756.0 million in prior-year advance procurement funding. The Navy's proposed FY2009 budget also requests $719.8 million in advance procurement funding for Virginia-class boats to be procured in future fiscal years, and $596.8 million in additional procurement funding for economic order quantity (EOQ) purchases of key components for eight Virginia-class submarines (the 11th boat and seven others) that are to be procured under a multiyear procurement (MYP) arrangement during the 5-year period FY2009-FY2013. As part of its action on the Navy's FY2008 shipbuilding budget, Congress added $588 million in advance procurement funding for an additional Virginia class submarine to be procured in a year prior to FY2012. The Navy, as part of its proposed FY2009 budget, included this additional submarine in its shipbuilding plan and scheduled it to be fully funded in FY2011. One issue for Congress for FY2009 is whether to accelerate the full funding of the newly added submarine from FY2011 to FY2010 or FY2009, so as to facilitate a follow-on option of funding an additional one or two Virginia-class submarines in FY2010 and/or FY2011. Supporters of this option could argue that it would mitigate a projected seven-boat shortfall in SSNs. Opponents could argue that it would place added pressure on the Navy's FY2009 budget and/or its FY2010 budget, making it more difficult for the Navy to fund other priorities in those years. This report will be updated as events warrant.




US Nuclear Submarines


Book Description

The adoption of nuclear power revolutionized submarine design and means that vessels can stay underwater for months, trailing the enemy or training weapons on land targets from secret positions, “always there, never seen.” Jim Christley, a former submariner, explores here the influence of Admiral Hyman Rickover in cautiously introducing these stealthy machines of war, and frankly discusses the power and perils of using nuclear reactors at sea. Using unique and detailed artwork, he outlines the many evolving aspects of design within the submarine classes, from the very first nuclear submarine, USS Nautilus, to the classes under construction even now.