Book Description

Provides guidance and a wide range of practical examples that will be helpful for both nuclear power plant (NPP) operating organisations and regulatory bodies in developing and improving the processes of authorization of control room personnel.




Project Management in Nuclear Power Plant Construction


Book Description

This publication provides guidance on project management from the preparatory phase to plant turnover to commissioning of nuclear power plants. The guidelines and experiences described will enable project managers to obtain better performance in nuclear power plant construction.




NUREG/CR.


Book Description




Nuclear Energy Basic Principles


Book Description

Describes the rationale and vision for the peaceful use of nuclear energy. The publication identifies the basic principles that nuclear energy systems must satisfy to fulfil their promise of meeting growing global energy demands.




Format and Content of the Safety Analysis Report for Nuclear Power Plants


Book Description

This Safety Guide is intended primarily for use with land based stationary thermal nuclear power plants but it may, in parts, have a wider applicability to other nuclear facilities. It provides recommendations and guidance on the possible format and content of a SAR in support of a request to the State regulatory body for authorization to construct and or operate a nuclear power plant. As such, it contains recommendations on meeting the requirements of Safety guide GS-R-1 "Legal and governmental infrastructure for nuclear, radioactive waste and transport safety" (2000, ISBN 9201008007)




Commissioning Guidelines for Nuclear Power Plants


Book Description

Commissioning is one of the key steps towards putting into service a new nuclear facility, or a new system, structure or component within an existing facility. Commissioning activities need to be planned early in the design and procurement process, with careful consideration of eventual acceptance criteria and test methods. This publication describes commissioning in its basic form, the commissioning process specific to nuclear power plants (NPPs), the relevant management system requirements, typical organizational models and critical human resources issues. It also provides details on experience and lessons learned obtained in IAEA Member States. The publication will be of use to all stakeholders involved in the commissioning of NPPs, including owner operators, contractors, engineers, regulatory bodies and vendors.













Authorization of Nuclear Power Plant Control Room Personnel


Book Description

Authorization of control room personnel is a normal practice in all IAEA Member States operating nuclear power plants (NPPs). The authorization of personnel is based on whether personnel has a direct impact on safety in accordance with IAEA Safety Guide No. NS-G-2.8 : Recruitment, Qualification and Training of Personnel for NPPs. The methods and practices for this authorization, however, are not identical, and the organization granting the authorization may be different. The various authorization processes are usually based on written and/or oral examinations and in many cases also on the testing of practical skills. Differences in the authorization processes also exist in the examination methodology and in the scope of the practical examinations (e.g., plant walkthrough, use of simulators). The recent increase in the availability of full-scope simulators, in particular full-scope plant-referenced control room simulators, provides an additional, efficient tool for testing the practical skills of the candidates for authorization. Information contained in this document and on the accompanying CD-ROM provides useful guidance and a wide range of practical examples that will be helpful for both NPP operating organizations and regulatory bodies in developing and improving the processes of authorization of control room personnel.--Résumé de l'éditeur.