Stochastic Project Networks


Book Description

Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective.




Resource Allocation in Project Management


Book Description

The book is devoted to structural issues, algorithms, and applications of resource allocation problems in project management. Special emphasis is given to a unifying framework within which a large variety of project scheduling problems can be treated. Those problems involve general temporal constraints among project activities, different types of scarce resources, and a broad class of regular and nonregular objective functions ranging from time-based and financial to resource levelling functions. The diversity of the models proposed allows for covering many features arising in scheduling applications beyond the field of project management such as short-term production planning in the manufacturing or process industries.




Applied Project Management


Book Description




Handbook on Project Management and Scheduling Vol. 2


Book Description

Due to the increasing importance of product differentiation and collapsing product life cycles, a growing number of value-adding activities in the industry and service sector are organized in projects. Projects come in many forms, often taking considerable time and consuming a large amount of resources. The management and scheduling of projects represents a challenging task and project performance may have a considerable impact on an organization's competitiveness. This handbook presents state-of-the-art approaches to project management and scheduling. More than sixty contributions written by leading experts in the field provide an authoritative survey of recent developments. The book serves as a comprehensive reference, both, for researchers and project management professionals. The handbook consists of two volumes. Volume 1 is devoted to single-modal and multi-modal project scheduling. Volume 2 presents multi-project problems, project scheduling under uncertainty and vagueness, managerial approaches and a separate part on applications, case studies and information systems.
















Project Scheduling


Book Description

Our objectives in writing Project Scheduling: A Research Handbook are threefold: (1) Provide a unified scheme for classifying the numerous project scheduling problems occurring in practice and studied in the literature; (2) Provide a unified and up-to-date treatment of the state-of-the-art procedures developed for their solution; (3) Alert the reader to various important problems that are still in need of considerable research effort. Project Scheduling: A Research Handbook has been divided into four parts. Part I consists of three chapters on the scope and relevance of project scheduling, on the nature of project scheduling, and finally on the introduction of a unified scheme that will be used in subsequent chapters for the identification and classification of the project scheduling problems studied in this book. Part II focuses on the time analysis of project networks. Part III carries the discussion further into the crucial topic of scheduling under scarce resources. Part IV deals with robust scheduling and stochastic scheduling issues. Numerous tables and figures are used throughout the book to enhance the clarity and effectiveness of the discussions. For the interested and motivated reader, the problems at the end of each chapter should be considered as an integral part of the presentation.




Project Management


Book Description

Project Management: A Risk-Management Approach prepares students to successfully navigate the many challenges, factors, and situations that project managers face.