Draft Environmental Impact Statement/draft Environmental Impact Report for the Eastside Transit Corridor Phase 2 Project
Author :
Publisher :
Page : pages
File Size : 49,96 MB
Release : 2014
Category :
ISBN :
Author :
Publisher :
Page : pages
File Size : 49,96 MB
Release : 2014
Category :
ISBN :
Author :
Publisher :
Page : 562 pages
File Size : 35,71 MB
Release : 2001
Category :
ISBN :
Author : CDM Smith
Publisher :
Page : 0 pages
File Size : 48,11 MB
Release : 2017
Category : Bell (Calif.)
ISBN :
The purpose of this Technical Study is to address issues identified in the November 2014 Board Motion, which the Metro Board of Directors passed subsequent to the release for public review on August 22, 2014 of the Eastside Transit Corridor Phase 2 Draft Environmental Impact Statement/Environmental Impact Report (Draft EIS/EIR). The Draft EIS/EIR studied two Build Alternatives to extend the Metro Gold Line east of its current terminus at Atlantic Boulevard in East Los Angeles: the State Route (SR) 60 Light Rail Transit (LRT) Alternative and the Washington Boulevard LRT Alternative. Based on the volume and scope of comments received on the Draft EIS/EIR, the Board deferred the selection of a Locally Preferred Alternative (LPA) and determined that additional technical investigation would be needed to address major areas of concern raised by Cooperating Agencies, corridor cities and stakeholders. In addition, the Board directed staff to identify a new north-south connection for the Washington Boulevard LRT Alternative and explore the feasibility of operating both the SR 60 LRT and Washington Boulevard LRT Alternatives. This report describes the results of the technical analysis and associated refinements to the project alternatives. In addition, it summarizes feedback received at community meetings, implications on the project scope and presents additional considerations for project implementation, including funding and environmental next steps. The final section presents recommendations for an updated Project Definition for Metro Board consideration.
Author :
Publisher :
Page : 48 pages
File Size : 11,95 MB
Release : 1983
Category : Environmental impact statements
ISBN :
Author :
Publisher :
Page : 772 pages
File Size : 17,91 MB
Release : 2001
Category :
ISBN :
Author :
Publisher :
Page : 868 pages
File Size : 24,58 MB
Release : 2001
Category :
ISBN :
Author : United States. Federal Transit Administration
Publisher :
Page : pages
File Size : 14,9 MB
Release : 2001
Category : Local transit
ISBN :
Author :
Publisher :
Page : 664 pages
File Size : 43,42 MB
Release : 2009
Category :
ISBN :
Author :
Publisher :
Page : 844 pages
File Size : 49,10 MB
Release : 2006
Category :
ISBN :
Author :
Publisher :
Page : 904 pages
File Size : 13,37 MB
Release : 2007
Category : Environmental impact statements
ISBN :