Portland Cement Concrete Resurfacing


Book Description

This synthesis report will be of special interest to pavement designers, materials engineers, and others seeking information on portland cement concrete resurfacings (overlays) placed over both portland and asphalt cement concrete pavements. Information is presented on the various practices in use for the design, material selection, and construction techniques associated with each pavement type. Additional information is provided on resurfacing experience and performance, including an Appendix cataloging more than 700 existing resurfacing projects in North America. Transportation agencies in the United States are continuing to develop pavement management systems which take an objective and structured approach to life-cycle cost analysis requirements for pavement rehabilitation project analysis. This report of the Transportation Research Board also discusses the considerations involved in the selection of technically feasible resurfacing alternatives. Based on the longitudinal experience of 375 resurfacing projects that were cataloged in 1982 and the more than 700 projects identified in 1993, much useful information on the performance characteristics of portland cement concrete resurfacing is presented.




Evaluation Findings of Bondade CU-31 Bonding Solution


Book Description

Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Service Center. The report describes a HITEC evaluation of Bondade CU-31 Bonding Solution, manufactured by Transpo Industries. The reportØdescribes a three-year program of field testing and evaluation designed to determine the effectiveness of Bondade CU-31 in extending the service life of pothole repairs.







Accelerated Rigid Paving Techniques


Book Description

This report represents nearly 6 years of collaboration among Federal Highway Administration (FHWA), State, and American Concrete Pavement Association (ACPA) engineers on the subject of Fastrack Concrete Paving. As an outgrowth of activities begun in 1986 in Storm Lake, Iowa, a Technical Working Group (TWG) assembled under the auspices of the FHWA's Special Project 201. Since the first meeting in Alexandria, Virginia, in 1988, the TWG has cooperated to construct pilot projects, test concrete material with the FHWA's mobile laboratory, sponsor workshops and conferences nationwide, simulate exercises on urban project designs, complete ACPA's Technical Bulletin on Fastrack, and support follow-on research. This report formally completes activities carried out under SP-201. It presents key information on opening-to-traffic criteria and pavement slab temperature management. It includes a summary of key projects built around the country in the last 6 years. It also includes a copy of ACPA's new bulletin and closes with reprints of several technical reports that may be of interest to the reader.