Inner Harbor Improvements Interim Report


Book Description

"This study expands upon the past studies by: 1) establishing the criteria for successful protection of the slips; 2) refining and updating the site environmental conditions based on state-of-the-art analytical tools and recent information; 3) developing a current understanding of construction methods and costs; 4) and reviewing, revising and developing proposed entineering solutions. This interim report provides a recommended strategy for physical model testing of proposed solutions, and documents the activities above which form the basis for the recommended strategy."--Page 1.




Harborpark


Book Description

Excerpt from Harborpark: Interim Design Standards for the Inner Harbor This study indicated that, within the is-month planning period, several key steps would be undertaken. One step identified as necessary the development of Interim Design Standards has been completed first for the Inner Harbor area where waterfront properties are experiencing the strongest development pressures. Interim Design Standards for the other four Harborpark neighborhoods: East Boston, Charlestown, South Boston, and Dorchester will be formulated in coming months. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.