Finding of No Significant Impact Proposed Corrective Action for the Northeast Site at the Pinellas Plant in Largo, Florida


Book Description

The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-0976) of the proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida. The Northeast Site contains contaminated groundwater that would be removed, treated, and discharged to the Pinellas County Sewer System. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C.4321 et.seq. Therefore, the preparation of an environmental impact statement is not required and the DOE is issuing this Finding of No Significant Impact (FONSI).




Marys Peak Bonneville Power Administration Communications Site Project Finding of No Significant Impact


Book Description

"BPA prepared an environmental assessment (EA) evaluating the three Proposed Action alternatives and a No Action Alternative. Based on the analysis in the EA, BPA has determined that Alternative 3C is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement (EIS) is not required for Alternative 3C and BPA is issuing this Finding of No Significant Impact (FONSI) for this alternative"--Summary.




Final Environmental Assessment - Battleground Energy Recovery Project, Harris County, Texas (DOE/EA-1769)


Book Description

The United States Department of Energy's (DOE's) National Energy Technology Laboratory (NETL) prepared this Environmental Assessment (EA) to analyze the potential environmental impacts of providing funding for the proposed Battleground Energy Recovery Project in Deer Park, Harris County, Texas. The proposed action is for DOE to provide $1.94 million in cost-shared funding to the Houston Advanced Research Center (HARC) for the Battleground Energy Recovery Project. The proposed project was selected by the DOE Office of Energy Efficiency and Renewable Energy (EERE) to advance research and demonstration of energy efficiency and renewable energy technologies. The proposed project would produce 8 megawatts (MWs) of electricity from high pressure steam generated by capturing heat that is currently lost at the Clean Harbors Deer Park (CHDP) facility. The proposed project is consistent with DOE's goal of increased use of energy efficiency and renewable energy generation projects. The proposed project involves installation of a specifically designed waste heat recovery boiler on the existing kiln afterburner of an incineration unit at the CHDP facility. This boiler would use heat from the incinerator flue gases to generate high-pressure superheated steam. The adjacent Dow Chemical plant would periodically consume part of the steam for process needs, replacing natural gas firing of existing boilers. The majority of the steam, however, would be piped to a new turbine generator (TG). The TG would be installed in a new building adjacent to the existing CHDP facility. Additional waste heat steam from the neighboring Dow Chemical plant would be routed to the TG when available. A cooling tower would be installed adjacent to the new building in the northwest corner of the facility. The 8 MWs of electricity generated by the TG would be used by the CHDP facility to offset purchased power; any excess power generated would be transmitted to the electric grid. Construction and installation activities associated with the proposed project would occur entirely within private industrial property. The project would require a construction permit and a minor amendment to the facility's air emissions operating permit. Additionally, modification to the facility's hazardous waste processing and disposal permit would be necessary. However, no significant adverse impacts are anticipated to result from implementation of this proposed project.