Final Draft


Book Description



















Final Draft Environmental Assessment


Book Description

"Finding of no significant impact and finding of no practicable alternative ... The Proposed Action consists of replacing the existing 13th Street Bridge over the Santa Ynez River with a new 590 to 805 feet long structure that would span the Santa Ynez River wetlands and associated riparian corridor, and provide a flood-free crossing for flows up to the 100-year flood level."--Page 1.