Book Description
Parsons Engineering Science, Inc. (Parsons ES), formerly Engineering-Science, Inc. (ES) was retained by the United States (US) Air Force Center for Environmental Excellence (AFCEE) to prepare a remedial action plan (RAP) in support of a risk-based remediation decision for soil and groundwater contaminated with fuel hydrocarbons at Site ST14 at Carswell Air Force Base (AFB), Texas. Parsons ES is an environmental consulting firm registered as a Corrective Action Specialist (CAS)(RCA00101B). Site ST14 consists of the petroleum, oil, and lubricant (POL) tank farm (Site ST14B) and the fuel loading area (Site ST14A). TNRCC has directed that Site ST14 (also known as Solid Waste Management Unit ((SWMU) 68) and associated areas be remediated under Title 31 Texas Administrative Code (TAC) Chapter 334, the Petroleum Storage Tank (PST) rules. This RAP also has been prepared in support of a risk-based remediation decision for Site SD13 which is downgradient from Site ST14, and is regulated under Title 31 TAC Chapter 335, the Resource Conservation and Recovery Act (RCRA) rules. Site SD13 consists of several permit-defined subsites, including SWMU 64 (the french underdrain system), SWMU 67 (the oil/water separator), and area of concern (AOC) 7 (the former base refueling area).