Comment Issue - Production Test IP-333-D


Book Description

To permit the irradiation of one dummy fuel element assembly for one operating period and to permit, during a subsequent operating period, the irradiation of one defected, four-rod-cluster UO2 fuel element assembly, in a KE front-to-rear test hole. The fuel material is natural UO2 of 95 per cent theoretical density; the cladding is zircaloy. The defect in the assembly is artificial and will be made before irradiation by drilling a .005in. diameter hole through the cladding near the mid-point of two of the rods.