TB 1-1520-240-20-147


Book Description

TB 1-1520-240-20-147




Manuals Combined: 100+ U.S. Army CH-47A CH-47B CH-47C and CH-47D Chinook Helicopter Operator; Repair Parts And Special Tools List; Modification Word Order; One Time Inspection; Maintenance; And Maintenance Test Flight Manuals


Book Description

Well over 18,000 total pages ... Most manuals published by the Department of the Army (with updates) between 1999 and 2003. Contains Repair, Repair Parts, Special Tools Lists, Maintenance, Checklist and Flight-related Technical Manuals and Bulletins for the CH-47A, CH-47B, CH-47C and CH-47D Chinook helicopter. Just a SAMPLE of the CONTENTS: AVIATION UNIT AND AVIATION INTERMEDIATE MAINTENANCE MANUAL CH-47D HELICOPTER, 1,335 pages - Aviation Unit and Aviation Intermediate Troubleshooting Manual, CH-47D Helicopter, 1,225 pages - ORGANIZATIONAL MAINTENANCE REPAIR PARTS AND SPECIAL TOOLS LISTS FOR ELECTRONIC EQUIPMENT CONFIGURATION FOR CH-47A, CH-47B, AND CH-47C HELICOPTERS, 116 pages - Preparation for Shipment of CH-47 HELICOPTER, 131 pages - OPERATOR, AVIATION UNIT, AND AVIATION INTERMEDIATE MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST EXTENDED RANGE FUEL SYSTEM ARMY MODEL CH-47 HELICOPTER, 194 pages - AVIATION UNIT AND INTERMEDIATEMAINTENANCE REPAIR PARTS AND SPECIAL TOOLS LIST (INCLUDING DEPOT MAINTENANCE REPAIR PARTS AND SPECIAL TOOLS) HELICOPTER, CARGO TRANSPORT CH-47D, 689 pages - AVIATION UNIT AND INTERMEDIATE MAINTENANCE REPAIR PARTS AND SPECIAL TOOLS LIST (INCLUDING DEPOT MAINTENANCE REPAIR PARTS AND SPECIAL TOOLS) HELICOPTER, CARGO TRANSPORT CH-47D, 511 pages - PREVENTIVE MAINTENANCE DAILY INSPECTION CHECKLIST CH-47D HELICOPTER, 30 pages - PHASED MAINTENANCE CHECKLIST CH-47D HELICOPTER, 117 pages - MAINTENANCE TEST FLIGHT MANUAL ARMY MODEL CH-47D HELICOPTER, 195 pages - Operator's and Crewmember's Checklist ARMY CH-47D HELICOPTER, 49 pages - ONE TIME VISUAL INSPECTION AND RECORDS CHECK OF THE UPPER BOOST ACTUATORS AND PULL TEST OF SWASHPLATE FOR ALL CH-47D, MH-47D, AND MH-47E AIRCRAFT, 11 pages - WARRANTY PROGRAM FOR HELICOPTER, CARGO TRANSPORT CH-47D, 28 pages - CALIBRATION PROCEDURE FOR CH-47 INTEGRATED LOWER CONTROL ACTUATOR (ILCA) BENCH TEST SET, 50 pages REPAIR PARTS AND SPECIAL TOOLS LIST FOR STABILITY AUGMENTATION SYSTEM AMPLIFIERS CH-47A, CH-47B, AND CH-47C HELICOPTERS, 53 pages - AVIATION UNIT AND AVIATION INTERMEDIATE MAINTENANCE For GENERAL TIE-DOWN AND MOORING ON ALL SERIES ARMY MODELS AH-64, UH-60, CH-47, UH-1, AH-1, OH-58 HELICOPTERS, 60 pages - OPERATOR'S MANUAL FOR CH-47D (CHINOOK) FLIGHT SIMULATOR Device 2B31A, 185 pages





Book Description
















Desert Shield and Desert Storm


Book Description

The Iraqi invasion of Kuwait on August the 2nd, 1990, and the resultant decision by the President to deploy land, air, and naval forces to protect Saudi Arabia and the United Arab Emirates led, since August the 8th, 1990, to a steady, measured commitment of soldiers, sailors, airmen and supporting equipment to Southwest Asia. That commitment, which began approaching its apparent apex by early November, suddenly broadened on the 8th of that month when the President expanded the original defensive objective to entail the liberation of Kuwait. His policy addendum called for doubling the 200,000 men in Southwest Asia to about 400,000, and he gave Iraq a January the 15th, 1991 deadline to quit Kuwait or face massive military force. Overall American policy in this matter could, therefore, be considered roughly three-phased: one, the original defensive deployment of 200,000 strong, August 8-November 8, 1990; two, the reinforcement to attack strength of about 400,000, November 8, 1990, to January 15, 1991; and three, January 16, 1991, to February 27, 1991- war.







Operator's Manual


Book Description