!Un liberal!


Book Description




Conceptual Design Report, TWRS Privatization Phase I, Site Development and Roads, Subproject W-505


Book Description

This document includes Conceptual Design Report (CDR) for the site development, construction of new roads and improvements at existing road intersections, habitat mitigation, roadway lighting, and construction power needed for the construction of two Private Contractor (PC) Facilities. Approximately 50 hectare (124 acres) land parcel, east of the Grout Facility, is planned for the PC facilities.







Brave New Neighborhoods


Book Description

First Published in 2004. Routledge is an imprint of Taylor & Francis, an informa company.




Data Quality Objectives for TWRS Privatization Phase 1


Book Description

The Phase 1 privatization contracts require that the Project Hanford Management Contract (PHMC) contractors, on behalf of the US Department of Energy, Richland Operations Office (RL), deliver the appropriate quantities of the proper composition of feed on schedule to the Privatization contractors (DOE-RL 1996). The type of feed needed, the amount of feed needed, and the overall timing of when feed is to be delivered to the Privatization contractor are specified by the contract. Additional requirements are imposed by the interface control document (ICD) for low-activity waste (LAW) feed (PHMC 1997a). The Tank Waste Remediation System Operation and Utilization Plan (TWRSO/UP) as updated by the Readiness-to-Proceed (RTP) deliverable establishes the baseline operating scenario for the delivery of feed to two Privatization contractors for the first twelve LAW batches. The project master baseline schedule (PMBS) and corresponding logic diagrams that will be used to implement the operating scenario have been developed and are currently being refined. The baseline operating scenario in the TWRSO/UP/RTP specifies which tanks will be used to provide feed for each specific feed batch, the operational activities needed to prepare and deliver each feed batch, and the timing of these activities. This operating scenario has considered such factors as the privatization contracts and ICD requirements, waste composition and chemistry, equipment availability, project schedules and funding, tank farm logistics and the availability of tank space. The PMBS includes activities to reduce programmatic risk.










Master Plan for Delhi


Book Description

" A Guide to Planning Norms & Development Controls in Delhi" A Publication that every resident of Delhi must read