Complex Contracting


Book Description

Complex Contracting draws on core social science concepts to provide wide-ranging practical advice on how best to manage complex acquisitions. Using a strong analytical framework, the authors assess contract management practices, suggesting strategies for improvement and ways to avoid the pitfalls of managing contracts for large and sophisticated projects. An in-depth analysis of the US Coast Guard's Deepwater program is included to illustrate ways to respond to real-world contracting challenges. This high-profile and controversial case consisted of a projected 25-year, $24 billion contract through which the US Coast Guard would buy a system of new boats, aircraft, communications, and control architecture to replace its aging fleet. The authors explore the reasons why this program, launched with such promise, turned out so poorly, and apply the lessons learned to similarly complex contracting scenarios. This engaging and accessible book has broad applicability and will appeal to policymakers, practitioners, scholars and students.







Pollution Prevention Equipment Under MARPOL.


Book Description

This publication provides reference to the IMO resolutions on shipboard pollution prevention equipment that are required under MARPOL. It is a revised and updated version of the 1997 edition and contains the live resolutions on pollution prevention equipment that are currently applicable to new installations onboard ships.--Publisher's description.




Macondo Well Deepwater Horizon Blowout


Book Description

The blowout of the Macondo well on April 20, 2010, led to enormous consequences for the individuals involved in the drilling operations, and for their families. Eleven workers on the Deepwater Horizon drilling rig lost their lives and 16 others were seriously injured. There were also enormous consequences for the companies involved in the drilling operations, to the Gulf of Mexico environment, and to the economy of the region and beyond. The flow continued for nearly 3 months before the well could be completely killed, during which time, nearly 5 million barrels of oil spilled into the gulf. Macondo Well-Deepwater Horizon Blowout examines the causes of the blowout and provides a series of recommendations, for both the oil and gas industry and government regulators, intended to reduce the likelihood and impact of any future losses of well control during offshore drilling. According to this report, companies involved in offshore drilling should take a "system safety" approach to anticipating and managing possible dangers at every level of operation-from ensuring the integrity of wells to designing blowout preventers that function under all foreseeable conditions-in order to reduce the risk of another accident as catastrophic as the Deepwater Horizon explosion and oil spill. In addition, an enhanced regulatory approach should combine strong industry safety goals with mandatory oversight at critical points during drilling operations. Macondo Well-Deepwater Horizon Blowout discusses ultimate responsibility and accountability for well integrity and safety of offshore equipment, formal system safety education and training of personnel engaged in offshore drilling, and guidelines that should be established so that well designs incorporate protection against the various credible risks associated with the drilling and abandonment process. This book will be of interest to professionals in the oil and gas industry, government decision makers, environmental advocacy groups, and others who seek an understanding of the processes involved in order to ensure safety in undertakings of this nature.







Disability from a Humanistic Perspective


Book Description

The Integrated Deepwater Systems (IDS) program, or Deepwater program for short, is a $24-billion, 25-year project to replace and modernise the Coast Guard's ageing fleet of deepwater-capable ships and aircraft. It is the largest and most complex acquisition effort in Coast Guard history, encompassing 91 new cutters, 124 new small surface craft, and 244 new or converted aeroplanes, helicopters, and unmanned aerial vehicles (UAVs). The Deepwater program has received a total of about $4.4 billion through FY2007, including about $1.14 billion in FY2007. For FY2008, the Coast Guard requested $836.9 million in new appropriations and the rescission of $48.8 million in prior-year appropriations for the program, for a net total request of $788.1 million. This new book presents an in-depth analysis of the program and its significance.







Journal of the House of Representatives of the United States


Book Description

Some vols. include supplemental journals of "such proceedings of the sessions, as, during the time they were depending, were ordered to be kept secret, and respecting which the injunction of secrecy was afterwards taken off by the order of the House".




The Coast Guard Fiscal Year 2002 Budget Request


Book Description