Defense Acquisitions


Book Description

Defense acquisitions : the expeditionary fighting vehicle encountered difficulties in design demonstration and faces future risks : report to congressional committees.




Defense acquisitions


Book Description




Gao-06-349 - Defense Acquisitions


Book Description

GAO-06-349 Defense Acquisitions: The Expeditionary Fighting Vehicle Encountered Difficulties in Design Demonstration and Faces Future Risks




Defense Acquisitions: The Expeditionary Fighting Vehicle Encountered Difficulties in Design Demonstration and Faces Future Risks


Book Description

Since the EFV program began the System Development and Demonstration (SDD) phase, its return on investment has eroded as costs have increased, deliveries have been delayed, and expected reliability has been lowered. Since December 2000, the EFV s total cost has grown by about $3.9 billion or 45 percent, to $12.6 billion. Cost per vehicle has increased from $8.5 million to $12.3 million. Deliveries of vehicles to the warfighter have been delayed, as planned production quantities have been reduced by about 55 percent over fiscal years 2006-2011, and the development schedule has grown by about 4 years, or 35 percent. Furthermore, a key requirement has been lowered. EFV reliability a key performance parameter has been reduced from 70 hours of continuous operation to 43.5 hours. Program difficulties occurred in part because not enough time was allowed to demonstrate maturity of the EFV design during SDD. Best practices (and current DOD acquisition policy) call for system integration work to be conducted before the critical design review is held. This review represents the commitment to building full-scale SDD prototypes that are representative of the production vehicle.




Oversight of Defense Department Acquisitions


Book Description




Defense Acquisitions


Book Description

The Future Combat System (FCS) program -- which comprises 14 integrated weapon systems and an advanced information network -- is the centerpiece of the Army¿s effort to transition to a lighter, more agile, and more capable combat force. This report includes an examination of: (1) how the definition, development, and demonstration of FCS capabilities are proceeding, particularly in light of the go/no-go decision scheduled for 2009; (2) the Army¿s plans for making production commitments for FCS and any risks related to the completion of development; and (3) the estimated costs for developing and producing FCS. Includes recommendations. Tables and figures.




Status of GAO Recommendations to the Department of Defense (Fiscal Years 2001-2007)


Book Description

A report to congressional committees regarding the DoD¿s progress in implementing GAO's recommendations over the last 7 years. During this period of time, GAO issued 637 reports to DoD that included 2,726 recommendations. By law, agencies, including DoD, are required to submit written statements explaining actions taken in response to recommendations that have been made. This report contains the results of an analysis on the implementation status of the 2,726 recommendations made to DoD in reports issued during FY 2001 through 2007. Includes examples of related financial accomplishments reported for the period, based on DoD-related work. Illustrations.




Improving Federal Financial Management


Book Description




The U.S. Combat and Tactical Wheeled Vehicle Fleets


Book Description

Congress recently requested a study of the U.S. ground combat and tactical wheeled vehicle fleets. The authors reveal risks in the technologies required to close capability gaps, the business processes used by the U.S. Department of Defense in managing vehicle production and modification initiatives, and the modeling and simulation process supporting research, development, and acquisition, making recommendations for mitigating these risks.




Expeditionary Fighting Vehicle Program Update


Book Description