DEVELOPMENT OF A MUD-PULSE HIGH-TEMPERATURE MEASUREMENT-WHILE-DRILLING (MWD) SYSTEM.


Book Description

The overall program objective is to develop a mud-pulse measurement-while-drilling (MWD) tool for oil and gas drilling operations that can be used where downhole temperatures are as high as 195 C (383 F). The work was planned to be completed in two phases: Phase I and an optional Phase II. The objectives of Phase I were first to identify critical components of existing MWD systems that can or cannot operate at 195 C. For components not able to meet the higher standard, one of several strategies was pursued: (1) locate high-temperature replacement components, (2) develop new designs that eliminate the unavailable components, or (3) use cooling to keep components at acceptable operating temperatures (under 195 C). New designs and components were then tested under high temperatures in the laboratory. The final goal of Phase I was to assemble two high-temperature MWD prototype tools and test each in at least one low-temperature well to verify total system performance. Phase II was also envisioned as part of this development. Its objective would be to test the two new high-temperature MWD prototype tools in wells being drilled in the United States where the bottom-hole temperatures were 195 C (or the highest temperatures attainable). The high-temperature MWD tool is designed to send directional and formation data to the surface via mud pulses, to aid in the drilling of guided wellbores. The modules that comprise the tool are housed in sealed barrels that protect the electronics from exposure to down-hole fluids and pressures. These pressure barrels are hung inside a non-magnetic collar located above the drilling assembly. A number of significant accomplishments were achieved during the course of the Phase I project, including: (1) Tested two MWD strings for function in an oven at 195 C; (2) Conducted field test of prototype 195 C MWD tool (at well temperatures up to 140-180 C); (3) Tested ELCON hybrid chip with processor, clock, and memory in a custom package for 700 hours at 200 C; (4) Contracted with APS Technology to conduct study of thermoelectric cooling of downhole electronics; (5) Conducted successful Peltier cooling test with APS Technology; (6) Tested and improved the electronics of Sperry Sun's Geiger Muller-based gamma detector for operation at 195 C; (7) Developed two high-temperature magnetometers (one in-house, one with Tensor); and (8) Encouraged outside source to develop lithium/magnesium high-temperature batteries (operating temperature of 125 to 215 C). One of this project's greatest achievements was improvement in Sperry Sun's current tool with changes made as a direct result of work performed under this project. These improvements have resulted in longer life and a more robust MWD tool at the previous temperature rating of 175 C, as well as at higher temperatures. A field test of two prototype 195 C MWD tools was conducted in Lavaca County, Texas. The purpose of this operation was to provide directional services on a sidetrack of a straight hole. The sidetrack was to intersect the formation up-dip above the water/gas interface. In addition, the gamma tool provided formation data including seam tops and thickness. Results from these field tests indicate progress in the development of a 195 C tool. Although the pulsers failed downhole in both tools, failure of the pulsers was determined to be from mechanical rather than electrical causes. Analysis of the economics of the 195 C tool highlights the greatest obstacle to future commercialization. Costs to screen individual components, then subassemblies, and finally completed tools for high-temperature operations are very high. Tests to date also show a relatively short life for high-temperature tools--on the order of 300 hours. These factors mean that the daily cost of the tool will be higher (3 to 5 times more) than a conventional tool.




Mud Pulse Logging While Drilling Telemetry System


Book Description

Mud pulse telemetry is a method of transmitting information from the vicinity of the drill bit to the surface drilling platform while drilling. Information can be conveyed through a flowing column of drilling mud by the presence or absence of pressure pulses arranged in a binary code. Pressure in the flowing mud column is periodically modulated at a point downhole by mechanical means, and the resulting periodic pressure pulses appearing at the surface end of the mud column are detected by a pressure transducer conveniently located in the standpipe. Although the concept of mud-pulse telemetry is not new, only recently have sophisticated systems embodying mud-powered turbine generators and solid-state electronics been developed to the point of being able to withstand the hostile downhole environment. After ten years of active technology development and over $10 million of R and D expenditures, Teleco has demonstrated through field tests carried out in the Gulf of Mexico during 1977, that equipment reliability necessary for commercial operation is essentially at hand. Three generations of prototype systems were tested under actual drilling conditions during 1968 through 1977. Using eight new production systems, Teleco began a Pilot Service Demonstration in August 1977, under a contract with the U.S. Department of Energy and six major oil companies. Each system consisting of a sensor assembly and mud pulse telemetry transmitter measures borehole azimuth, inclination, and tool facing. Accurate directional measurements have been provided from kick-off through to target depth with minimum interruption to the drilling operation. Tool face information has been used to successfully kick-off directional wells using both mud motor and jet deflection techniques. Equipment reliability, as indicated by recent test runs of 254 and 272 hours of drilling with two separate systems, without failure, is approaching the level needed for commercial service.




An Innovative High-Temperature High-Pressure Measurement While Drilling (MWD) Tool


Book Description

Measurement while drilling (MWD) tools specified to 150 C (302 F) that provide wellbore surveys, real-time inclination, and natural gamma ray detection are a commodity item in the oilfield services industry. MWD tools specified to 175 C (347 F) that routinely demonstrate highly reliable operation are available from only a few service companies. Commercial MWD tools that reliably operate to 200 C (392 F) for extended periods of time and offer features like real-time gamma ray, retrievability, and reseatability are nonexistent. Need for these higher temperature tools will increase as wells become hotter in the search for new oil and gas resources. The goal of this project was to design a retrievable and reseatable high-pressure/high-temperature MWD tool with real-time continuous inclination, vibration detection, annular pressure, and gamma ray detection. This report describes the development of such a tool from concept, through feasibility, and into field testing and preliminary development planning. It describes the challenges encountered in the design of the tool, along with testing results and decisions about the commercial viability of the tool in the configuration in which it was developed. The decision was made not to commercialize the tool developed under this project because of a combination of battery technology problems and modulation power consumption at the required depths.




Measurement While Drilling


Book Description

Trade magazines and review articles describe MWD in casual terms, e.g., positive versus negative pulsers, continuous wave systems, drilling channel noise and attenuation, in very simple terms absent of technical rigor. However, few truly scientific discussions are available on existing methods, let alone the advances necessary for high-data-rate telemetry. Without a strong foundation building on solid acoustic principles, rigorous mathematics, and of course, fast, inexpensive and efficient testing of mechanical designs, low data rates will impose unacceptable quality issues to real-time formation evaluation for years to come. This all-new revised second edition of an instant classic promises to change all of this. The lead author and M.I.T.-educated scientist, Wilson Chin, has written the only book available that develops mud pulse telemetry from first principles, adapting sound acoustic principles to rigorous signal processing and efficient wind tunnel testing. In fact, the methods and telemetry principles developed in the book were recently adopted by one of the world's largest industrial corporations in its mission to redefine the face of MWD. The entire engineering history for continuous wave telemetry is covered: anecdotal stories and their fallacies, original hardware problems and their solutions, different noise mechanisms and their signal processing solutions, apparent paradoxes encountered in field tests and simple explanations to complicated questions, and so on, are discussed in complete "tell all" detail for students, research professors and professional engineers alike. These include signal processing algorithms, signal enhancement methods, and highly efficient "short" and "long wind tunnel" test methods, whose results can be dynamically re-scaled to real muds flowing at any speed. A must read for all petroleum engineering professionals!




High Data Rate, MWD Mud Pulse Telemetry System


Book Description

The objective of this project is to build and test a research prototype of a 20-30 bits/second MWD mud-pulse telemetry system. At current telemetry rates of 1-3 bits/second the driller must be very selective about what drilling data is transmitted. This lack of information makes it more difficult to optimize the drilling of wells. Halliburton has demonstrated that a 30 bits/second mud-pulse signal can be recovered in a 10,000 foot flow loop using non-real-time processing. This project will develop and test a telemetry receiver for real-time telemetry, collect and analyze drilling noise data and estimate feasible data rates while drilling.




Geothermal Energy Update


Book Description







Fossil Energy Update


Book Description




Energy Research at DOE


Book Description

In legislation appropriating funds for DOE's fiscal year (FY) 2000 energy R&D budget, the House Interior Appropriations Subcommittee directed an evaluation of the benefits that have accrued to the nation from the R&D conducted since 1978 in DOE's energy efficiency and fossil energy programs. In response to the congressional charge, the National Research Council formed the Committee on Benefits of DOE R&D on Energy Efficiency and Fossil Energy. From its inception, DOE's energy R&D program has been the subject of many outside evaluations. The present evaluation asks whether the benefits of the program have justified the considerable expenditure of public funds since DOE's formation in 1977, and, unlike earlier evaluations, it takes a comprehensive look at the actual outcomes of DOE's research over two decades.