Draft Remedial Investigation Report for Remedial Investigation/feasibility Study at GMC-CFD Massena Facility


Book Description

Volume II of the report remedial investigation / feasibility study at GMC-CFD Massena facility is constitued of seven (7) appendices: A: Boring logs for monitoring wells installed during the RI; B: Boring logs for soil and waste borings; C: Well construction diagrams for RI monitoring wells; D: Boring logs and well construction diagrams from previous investigations; E: Results of laboratory grain-size analyses; F: Results of laboratory permeability tests and G: Results of single-well response tests