Engineering Evaluation Cost Analysis for the 100-B


Book Description

In 1995, the US Department of Energy (DOE), Richland Operations Office (RL) conducted a removal site evaluation of selected facilities in the 100 Area of the Hanford Site in accordance with CERCLA and 40 Code of Federal Regulations (CFR) 300.410. The scope of the evaluation included the aboveground portions of the 108-F Biology Laboratory in the 100-F Area and all inactive ancillary buildings and structures in the 100-B/C Area, excluding the reactor building and the river outfall. Based on the evaluation, RL determined that hazardous substances in the 108-F Biology Laboratory and five of the 100-B/C Area facilities may present a potential threat to human health or the environment, and that a non-time critical removal action at these facilities is warranted. This determination was documented in an engineering evaluation/cost analysis (EE/CA) approval memorandum. The EE/CA approval memorandum is the basis on which to proceed with the performance of an EE/CA to determine the appropriate removal action. This report presents the results of the EE/CA for removal alternatives for final disposition of these six facilities. The EE/CA was conducted pursuant to the requirements of CERCLA and 40 CFR 300.415 and is intended to aid RL and the EPA in selecting a preferred removal action.













Action Memorandum for the Engineering Test Reactor Under the Idaho Cleanup Project


Book Description

This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.