Early Site Permit (ESP) at the Exelon ESP Site
Author :
Publisher :
Page : 506 pages
File Size : 26,17 MB
Release : 2006
Category :
ISBN :
Author :
Publisher :
Page : 506 pages
File Size : 26,17 MB
Release : 2006
Category :
ISBN :
Author : U.s. Nuclear Reglatory Commission
Publisher : CreateSpace
Page : 502 pages
File Size : 13,83 MB
Release : 2014-06-14
Category : Technology & Engineering
ISBN : 9781500203016
This environmental impact statement (EIS) has been prepared in response to an application submitted to the U.S. Nuclear Regulatory Commission (NRC) by Exelon Generation Company, LLC (Exelon) for an early site permit (ESP). The proposed action requested in Exelon's application is for the NRC to (1) approve a site within the existing Clinton Power Station (CPS) boundaries as suitable for the construction and operation of a new nuclear power generating facility and (2) issue an ESP for the proposed site identified as the Exelon ESP site located adjacent to the CPS. In its application, Exelon proposes a plan for redressing the environmental effects of certain site-preparation and construction activities, i.e., those activities allowed by Title 10 of the Code of Federal Regulations (CFR) 50.10(e)(1), performed by an ESP holder under 10 CFR 52.25. In accordance with the plan, the site would be redressed if the NRC issues the requested ESP (containing the site redress plan), the ESP holder performs these site-preparation and construction activities, the ESP is not referenced in an application for a construction permit or combined operating license, and no alternative use is found for the site. This EIS includes the NRC staff's analysis that considers and weighs the environmental impacts of constructing and operating a new nuclear unit at the Exelon ESP site or at alternative sites, and mitigation measures available for reducing or avoiding adverse impacts. It also includes the staff's recommendation to the Commission regarding the proposed action.
Author :
Publisher :
Page : pages
File Size : 19,95 MB
Release : 2006
Category :
ISBN :
Author : U.s. Nuclear Reglatory Commission
Publisher : CreateSpace
Page : 498 pages
File Size : 50,51 MB
Release : 2014-06-14
Category : Technology & Engineering
ISBN : 9781500203030
This environmental impact statement (EIS) has been prepared in response to an application submitted to the U.S. Nuclear Regulatory Commission (NRC) by Exelon Generation Company, LLC (Exelon) for an early site permit (ESP). The proposed action requested in Exelon's application is for the NRC to (1) approve a site within the existing Clinton Power Station (CPS) boundaries as suitable for the construction and operation of a new nuclear power generating facility and (2) issue an ESP for the proposed site identified as the Exelon ESP site located adjacent to the CPS. In its application, Exelon proposes a plan for redressing the environmental effects of certain site-preparation and construction activities, i.e., those activities allowed by Title 10 of the Code of Federal Regulations (CFR) 50.10(e)(1), performed by an ESP holder under 10 CFR 52.25. In accordance with the plan, the site would be redressed if the NRC issues the requested ESP (containing the site redress plan), the ESP holder performs these site-preparation and construction activities, the ESP is not referenced in an application for a construction permit or combined operating license, and no alternative use is found for the site. This EIS includes the NRC staff's analysis that considers and weighs the environmental impacts of constructing and operating a new nuclear unit at the Exelon ESP site or at alternative sites, and mitigation measures available for reducing or avoiding adverse impacts. It also includes the staff's recommendation to the Commission regarding the proposed action.
Author : U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation. Division of Regulatory Improvement Programs
Publisher :
Page : pages
File Size : 25,27 MB
Release : 2005
Category : Nuclear power plants
ISBN :
Author :
Publisher :
Page : pages
File Size : 45,11 MB
Release : 2006
Category : Nuclear power plants
ISBN :
Author : U.s. Nuclear Reglatory Commission
Publisher : CreateSpace
Page : 472 pages
File Size : 43,54 MB
Release : 2014-06-14
Category : Technology & Engineering
ISBN : 9781500202859
The staff of the U.S. Nuclear Regulatory Commission (NRC) has prepared this Supplement to the Draft Environmental Impact Statement (EIS) for an Early Site Permit (ESP) at the North Anna ESP Site (SDEIS) because Dominion Nuclear North Anna, LLC (Dominion or applicant) amended its ESP application, as described in Revision 6 to its application for an ESP. In Revision 6 (which was submitted to the NRC on April 13, 2006), Dominion described a new approach for cooling its proposed Unit 3. Under the revised approach, Unit 3 would use a closed-cycle cooling system, rather than the originally proposed once-through cooling system. The newly-proposed system would not use the 1376-ha (3400-ac) waste heat treatment facility for cooling. Dominion also proposed to increase the power level of both proposed Units 3 and 4 from 4300 megawatts-thermal (MW(t)) to 4500 MW(t).
Author :
Publisher :
Page : 302 pages
File Size : 45,30 MB
Release : 2008
Category :
ISBN :
Author : U.S. Nuclear Regulatory Commission. Division of Site and Environmental Reviews
Publisher :
Page : pages
File Size : 34,90 MB
Release : 2006
Category : Nuclear power plants
ISBN :
Author : U.S. Nuclear Regulatory Commission. Office of New Reactors
Publisher :
Page : pages
File Size : 47,54 MB
Release : 2015
Category : Environmental impact statements
ISBN :