Expedient Snow Airstrip Construction Technique


Book Description

Specialized snow runway processing and construction equipment ordinarily is not available to Army engineer troop units. Therefore, utilization of existing equipment and devices improvised in the field is necessary. Disaggregation of the natural snow cover, followed immediately by compaction and grading, is the fundamental procedure required for preparing a snow pavement capable of supporting, after age hardening, wheeled aircraft of the Caribou and C-47 class. A peg-toothed A-frame harrow, a corrugated roller and drags, constructed in the field, can be used with available D-7 or D-8 bulldozers for the disaggregation, compaction, and grading processes. (Author).




Expedient Snow Airstrip Construction Technique


Book Description

Specialized snow runway processing and construction equipment ordinarily is not available to Army engineer troop units. Therefore, utilization of existing equipment and devices improvised in the field is necessary. Disaggregation of the natural snow cover, followed immediately by compaction and grading, is the fundamental procedure required for preparing a snow pavement capable of supporting, after age hardening, wheeled aircraft of the Caribou and C-47 class. A peg-toothed A-frame harrow, a corrugated roller and drags, constructed in the field, can be used with available D-7 or D-8 bulldozers for the disaggregation, compaction, and grading processes. (Author).




Monthly Catalog of United States Government Publications


Book Description

February issue includes Appendix entitled Directory of United States Government periodicals and subscription publications; September issue includes List of depository libraries; June and December issues include semiannual index







Snow Roads and Runways


Book Description







Special Report


Book Description




Roads and Airfields in Cold Regions


Book Description

This state-of-the-practice report on the design and development of roads and airfields is the eighth monograph in a series prepared by the Technical Council on Cold Regions Engineering of the American Society of Civil Engineers. Previous reports in the series covered such topics as frost action and its control embankment design, and arctic coastal processes. This book discusses such topics as: 1) Route-location/siting; 2) frost action; 3) design for permafrost conditions; 4) low temperature cracking; 5) maintenance; 6) use of geosynthetics; and 7) materials specifications and testing. This monograph contributes a substantial amount of new material to the Cold Regions Engineering series.