Book Description
Excerpt from Feasibility of Serving the Ventura County Flood Control District From the State Water Project In November 1960 the California Water Resources Development Bond Act was approved by the State's electorate, paving the way for the construction of the State Water Project. Since that time, many local water agencies throughout the State have applied to the Department of Water Resources for consideration as potential contractors with the State for water service from.the proposed facilities. Within Ventura County, both the Ventura County Flood Control District and the united.water Conservation District asked that they be considered as potential contractors for water from.the State Water Project. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.