Project-level Tiered Environmental Impact Report for South Airfield Improvement Project, Los Angeles International Airport (LAX)


Book Description

This document (Volume 3) comprises the second and final part of the Environmental Impact Report for the South Airfield Improvement Project (SAIP) and supplements the Draft EIR for the SAIP (consisting of Volumes 1 and 2), previously circulated for public review and comment.










Project-level Tiered Draft Environmental Impact Report (DEIR) for South Airfield Improvement Project, Los Angeles International Airport (LAX)


Book Description

The proposed project consists of the relocation of Runway 7R/25L approximately 55 feet to the south and the construction of a new center parallel taxiway between the two south runways. These improvements were identified as part of the LAX Master Plan EIR certified by the Los Angeles City Council in December of 2004.




Project-level Tiered Draft Environmental Impact Report (DEIR), South Airfield Improvement Project, Los Angeles International Airport (LAX)


Book Description

The proposed project consists of the relocation of Runway 7R/25L approximately 55 feet to the south and the construction of a new center parallel taxiway between the two south runways. These improvements were identified as part of the LAX Master Plan EIR certified by the Los Angeles City Council in December of 2004.




Main document


Book Description

The proposed project consists of the relocation of Runway 7R/25L approximately 55 feet to the south and the construction of a new center parallel taxiway between the two south runways. These improvements were identified as part of the LAX Master Plan EIR certified by the Los Angeles City Council in December of 2004.