Arbitration Procedure 1997


Book Description

- Arbitration procedure 1997 - Sample documents - Notice to refer a dispute to arbitration - Notice to concur in the appointment of an Arbitrator - Application for the appointment of an Arbitrator




ICE Adjudication Procedure (1997)


Book Description

This title provides practical guidance to the new ICE Adjudication Procedure (1997). It includes a review of the requirements of the Housing Grants and Construction Regeneration Act 1996 and their application to construction adjudication. The Procedure is reviewed in detail, with notes on each clause and guidance for practical application.




ICE Arbitration Procedure 2006


Book Description

- Acknowledgement - Arbitration Procedure (2006) - Part A. Objectives, references and appointment - Part B. Arrangements for the arbitration - Part C. Control of the proceedings - Part D. Procedures before the hearing - Part E. Procedure at the hearing - Part F. Short procedure - Part G. Expedited procedure - Part H. Special procedure for experts - Part J. Awards - Part K. Miscellaneous - Table 1 - Sample documents




ICE Conditions of Contract


Book Description

This edition takes into consideration the revisions of the Landfill Tax, Housing Grants Construction and Regeneration Act, and Contracts (Rights of Third Parties) Act. There are minor alterations to the contract that bring the wording into line with the Design and Construct Conditions of Contract. Other changes clarify the intention of the clause. In some sections the clauses have been re-numbered to present a more logical sequence to the contract. A few clauses have been changed substantially and an On Default performance Bond is included which has been drafted in more modern English.




ICE Conditions of Contract Target Cost Version, First Edition


Book Description

Helps towards delivering construction projects on time by enabling better client-contractor communication. This publication will help towards delivering construction projects on time by enabling better client-contractor communication. The new contract allows the employer, usually with the assistance of the contractor, to set a clear target for the cost of the civil engineering works to be carried out, in order to avoid projects overrunning on cost and deadline. ICE's latest contract also encourages the contractor to be more closely involved in the project at an early stage, such as project design, and provides an incentive for the employer and contractor to share profit or loss if the costs differ from the original estimation.To utilise the Target Cost Version effectively, a more open style of control and management is required which will permit an early and joint approach to the identification and management of risks. This is intended to lead to better channels of communication at an early stage between client and contractor. The Target Cost version - the latest member of the ICE Conditions of Contract family - has been produced due to industry demand.




Construction Arbitrations 2e


Book Description

Substantially revised to take account of the 1996 Arbitration Act, this book provides a practical guide for arbitrators (primarily non-lawyers) and parties to arbitration.




Arbitration Practice in Construction Contracts


Book Description

Since it came into force on 31 January 1997 the Arbitration Act 1996 has generally been welcomed by users and practitioners in the construction industry. It has fulfilled expectations that it would provide a user-friendly and practical basis of resolving disputes arising from construction contracts in a fair, expeditious and economical way. In doing so it has generated a modest volume of case law that has demonstrated the excellence of the Act's provisions and its drafting. Since the Fourth Edition of this book appeared in 1997 the Housing Grants, Construction and Regeneration Act 1996 with its Scheme for Construction Contracts Regulations 1998 have come into force, as have the Civil Procedure Rules 1998, both of which affect the resolution of disputes arising from construction contracts. Case law has arisen from the Construction Act, and from the House of Lords' judgment in the Beaufort Developments case, overturning the much-criticised judgment of the Court of Appeal in Crouch. In this Fifth Edition of an established text the author deals with each stage of an arbitration, explaining in practical terms the procedures to be adopted in avoiding disputes and in dealing with them efficiently when they do arise. It features over 20 specimen arbitration documents and includes the full text of the Act. It also covers several important developments in case law affecting construction arbitrations, and refers to the introduction and case law arising from adjudication under the Housing Grants, Construction and Regeneration Act 1996.




ICE Conditions of Contract for Minor Works


Book Description

The new edition of ICE Conditions of Contract for Minor Works has been updated to include relevant legislation such as the Housing Grants Construction and Regeneration (HGCR) Act, the Contracts (Right of Third Parties) Act, the Arbitration Act and a new national agreement the Scottish Arbitration Code with the ICE's annex (2001) to that code. Clause 11 has been modified so that the new addendum A is incorporated to accommodate both the HGCR and Arbitration Acts. notes show how the original disputes procedure replaces clause 11 and addendum A.




ICE Design and Construct Conditions of Contract


Book Description

Developed from the ICE Conditions of contract 6th edition by the CCSJC, these new conditions are designed to meet a widely felt need in the construction industry for use over the whole range of design and construct situations.




The ICE Conditions of Contract


Book Description

The ICE Conditions continues to be the dominant form of contract for civil engineering, despite the growing importance of the New Engineering Contract. The Seventh Edition of the ICE Conditions, published in 1999, introduced a number of changes, including: incorporating some of the concepts of the Latham Report amending certain provisions of the Sixth Edition which had attracted criticism rectifying conspicuous omissions from the text of earlier editions of the contract correcting small errors and faults from the previous edition modernising certain provisions and terms Brian Eggleston, whose previous book on the ICE Conditions was described as 'likely to become the authoritative reference source for the Sixth Edition', examines the contract clause by clause from a practical and legal viewpoint. There is extensive coverage of case law. Written by an experienced civil engineer and recognized authority on construction contracts, this book is an essential guide.