This report presents the results from a Remedial Investigation (RI) for two sites at the Utah Air National Guard (UANG) Base located in Salt Lake City, Utah. Stone & Webster Engineering Corporation (Stone & Webster) performed the work for the Air National Guard (ANG) Readiness Center under Task No. 2 of Contract No. DAHA9O-94-D-0009. The two sites investigated are identified as Installation Restoration Program (IRP) Site 8, a former underground storage tank (UST) location, and IRP Site 10, an existing petroleum, oil, and lubricants (POL) yard. The RI was conducted as outlined in the Remedial Investigation/Feasibility Study (RI/FS) Work Plan prepared by Stone & Webster and submitted to and approved by the ANG in May 1993. The field work associated with the RI was performed in June, July, and August 1995.