Language! Live:
Author : Louisa Cook Moats
Publisher :
Page : pages
File Size : 32,21 MB
Release : 2015
Category : Composition (Language arts)
ISBN : 9781491690130
Author : Louisa Cook Moats
Publisher :
Page : pages
File Size : 32,21 MB
Release : 2015
Category : Composition (Language arts)
ISBN : 9781491690130
Author : Suzanne F. Peregoy
Publisher : Pearson
Page : 528 pages
File Size : 15,69 MB
Release : 2016-01-11
Category : Education
ISBN : 9780134014548
Note: This is the bound book only and does not include access to the Enhanced Pearson eText. To order the Enhanced Pearson eText packaged with a bound book, use ISBN 0134403398. This book is the ideal source for teaching oral language, reading, writing, and the content areas in English to K-12 English learners. In an approach unlike most other books in the field, "Reading, Writing, and Learning in ESL" looks at contemporary language acquisition theory as it relates to instruction and provides detailed suggestions and methods for motivating, involving, and teaching English language learners. Praised for its strong research base, engaging style, and inclusion of specific teaching ideas, the book offers thorough coverage of oral language, reading, writing, and academic content area instruction in English for K-12 English learners. Thoroughly updated throughout, the new edition includes a new chapter on using the Internet and other digital technologies to engage students and promote learning, many new teaching strategies, new and revised activities, and new writing samples. The Enhanced Pearson eText features embedded videos and assessments. Improve mastery and retention with the Enhanced Pearson eText* The Enhanced Pearson eText provides a rich, interactive learning environment designed to improve student mastery of content. The Enhanced Pearson eText is: Engaging. The new interactive, multimedia learning features were developed by the authors and other subject-matter experts to deepen and enrich the learning experience. Convenient. Enjoy instant online access from your computer or download the Pearson eText App to read on or offline on your iPad(r) and Android(r) tablet.* Affordable.The Enhanced Pearson eText may be purchased stand-alone for 50-60% less than a print bound book. * "The Enhanced eText features are only available in the Pearson eText format. They are not available in third-party eTexts or downloads." "*The Pearson eText App is available on Google Play and in the App Store. It requires Android OS 3.1-4, a 7 or 10 tablet, or iPad iOS 5.0 or later." "
Author :
Publisher :
Page : 748 pages
File Size : 22,58 MB
Release : 2001
Category : Education
ISBN :
Author : Continental Press
Publisher :
Page : pages
File Size : 30,23 MB
Release : 2006-01
Category : Reading comprehension
ISBN : 9780845416815
Can a fish cough? With level B of Reading for Comprehension, your students will learn all about this kid-friendly topic and many more. This book for grade 2 students includes 46 high-interest, nonfiction articles with questions that reinforce key reading and writing skills commonly found on state tests. Multiple-choice questions test these reading skills: vocabulary, main idea and details, sequence, cause and effect, and inferences and conclusions. Students also answer open-ended questions to practice writing narrative text, descriptive text, persuasive text, and expository text.
Author : Jason Reynolds
Publisher : Simon and Schuster
Page : 333 pages
File Size : 49,9 MB
Release : 2017-10-24
Category : Young Adult Fiction
ISBN : 1481438271
“An intense snapshot of the chain reaction caused by pulling a trigger.” —Booklist (starred review) “Astonishing.” —Kirkus Reviews (starred review) “A tour de force.” —Publishers Weekly (starred review) A Newbery Honor Book A Coretta Scott King Honor Book A Printz Honor Book A Time Best YA Book of All Time (2021) A Los Angeles Times Book Prize Winner for Young Adult Literature Longlisted for the National Book Award for Young People’s Literature Winner of the Walter Dean Myers Award An Edgar Award Winner for Best Young Adult Fiction Parents’ Choice Gold Award Winner An Entertainment Weekly Best YA Book of 2017 A Vulture Best YA Book of 2017 A Buzzfeed Best YA Book of 2017 An ode to Put the Damn Guns Down, this is New York Times bestselling author Jason Reynolds’s electrifying novel that takes place in sixty potent seconds—the time it takes a kid to decide whether or not he’s going to murder the guy who killed his brother. A cannon. A strap. A piece. A biscuit. A burner. A heater. A chopper. A gat. A hammer A tool for RULE Or, you can call it a gun. That’s what fifteen-year-old Will has shoved in the back waistband of his jeans. See, his brother Shawn was just murdered. And Will knows the rules. No crying. No snitching. Revenge. That’s where Will’s now heading, with that gun shoved in the back waistband of his jeans, the gun that was his brother’s gun. He gets on the elevator, seventh floor, stoked. He knows who he’s after. Or does he? As the elevator stops on the sixth floor, on comes Buck. Buck, Will finds out, is who gave Shawn the gun before Will took the gun. Buck tells Will to check that the gun is even loaded. And that’s when Will sees that one bullet is missing. And the only one who could have fired Shawn’s gun was Shawn. Huh. Will didn’t know that Shawn had ever actually USED his gun. Bigger huh. BUCK IS DEAD. But Buck’s in the elevator? Just as Will’s trying to think this through, the door to the next floor opens. A teenage girl gets on, waves away the smoke from Dead Buck’s cigarette. Will doesn’t know her, but she knew him. Knew. When they were eight. And stray bullets had cut through the playground, and Will had tried to cover her, but she was hit anyway, and so what she wants to know, on that fifth floor elevator stop, is, what if Will, Will with the gun shoved in the back waistband of his jeans, MISSES. And so it goes, the whole long way down, as the elevator stops on each floor, and at each stop someone connected to his brother gets on to give Will a piece to a bigger story than the one he thinks he knows. A story that might never know an END…if Will gets off that elevator. Told in short, fierce staccato narrative verse, Long Way Down is a fast and furious, dazzlingly brilliant look at teenage gun violence, as could only be told by Jason Reynolds.
Author :
Publisher :
Page : 910 pages
File Size : 33,68 MB
Release : 1984
Category : Education
ISBN :
Author : Felicity O'Dell
Publisher : Cambridge University Press
Page : 123 pages
File Size : 39,58 MB
Release : 2012-03
Category : Foreign Language Study
ISBN : 0521181739
An updated and revised edition of the Objective CAE course, which prepares students for Cambridge English: Advanced, also known as Certificate in Advanced English (CAE). The syllabus for this exam has changed and this book has now been replaced by 9781107681453 Objective Advanced Fourth edition Teacher's Book with Teacher's Resources CD-ROM.
Author : George E. Pawlas
Publisher : John Wiley & Sons
Page : 574 pages
File Size : 33,6 MB
Release : 2007-06-29
Category : Education
ISBN : 0470087587
Specifically designed for the introductory course, this text provides an overview of the field of instructional supervision. Acquaints students with not only the authors’ views on supervision, but with those of other specialists in the field, placing heavy emphasis on practice and the supervisor’s responsibilities as an instructional leader. Continues to stress that the relationship between the supervisor and teacher is built on trust and that the overall goal is to improve student achievement through better instruction.
Author : Mary R. Harmon
Publisher : Routledge
Page : 248 pages
File Size : 48,63 MB
Release : 2012-09-10
Category : Education
ISBN : 1135653534
Beyond Grammar: Language, Power, and the Classroom asks readers to think about the power of words, the power of language attitudes, and the power of language policies as they play out in communities, in educational institutions, and in their own lives as individuals, teachers, and participants in the larger community. Each chapter provides extended discussion of a set of critical language issues that directly affect students in classrooms: the political nature of language, the power of words, hate language and bullying, gender and language, dialects, and language policies. Written for pre-service and practicing teachers, this text addresses how teachers can alert students to the realities of language and power--removing language study from a “neutral” corner to situate it within the context of political, social, and cultural issues. Developing a critical pedagogy about language instruction can help educators understand that classrooms can either maintain existing inequity or address and diminish inequity through critical language study. A common framework structures the chapters of the text: * Each chapter begins with an overview of the language issue in question, and includes references for further research and for classroom use, and provides applications for classroom teachers. * Numerous references to the popular press and the breadth of language issues found therein foreground current thought on socio-cultural language issues, attitudes, standards, and policies found in the culture(s) at large. * References to current and recent events illustrate the language issue’s importance, cartoons address the issue, and brief “For Thought” activities illustrate the point being discussed and extend the reader’s knowledge and awareness. * “Personal Explorations” ask readers to go beyond the text to develop further understanding; “Teaching Explorations” ask teachers to apply chapter content to teaching situations. Beyond Grammar: Language, Power, and the Classroom is intended for undergraduate and master’s level courses that address literacy education, linguistics, and issues of language and culture.
Author :
Publisher :
Page : 3310 pages
File Size : 40,26 MB
Release : 1997
Category : American literature
ISBN :