Manufactured Gas Plant Remediation


Book Description

The assessment, remediation, and redevelopment of manufactured gas plant (MGP) sites pose a significant technical and financial challenge to successor property owners, including municipalities and other public entities undertaking brownfields revitalization, and to their consulting environmental engineers. Due to the toxicity of many coal tar constituents, sites contaminated as a result of gasworks operations pose a significant threat to public health. This book will discuss the history of the manufactured gas industry in Massachusetts (the largest in the US), as well as the toxicity of gasworks waste products, technical challenges in the cleanup process, and the process for site cleanups.







Remediation of Former Manufactured Gas Plants and Other Coal-Tar Sites


Book Description

Winner of the 2013 Claire P. Holdredge Awardee for Remediation of Former Manufactured Gas Plants and Other Coal-Tar Sites.This award, first established in 1962 by the Association of Environmental and Engineering Geologists, is named in honor of Claire P. Holdredge, a founding member and the first President of the Association. The award is




Manufactured Gas Plant Remediation


Book Description

The assessment, remediation, and redevelopment of manufactured gas plant (MGP) sites pose a significant technical and financial challenge to successor property owners, including municipalities and other public entities undertaking brownfields revitalization, and to their consulting environmental engineers. Due to the toxicity of many coal tar constituents, sites contaminated as a result of gasworks operations pose a significant threat to public health. This book will discuss the history of the manufactured gas industry in Massachusetts (the largest in the US), as well as the toxicity of gasworks waste products, technical challenges in the cleanup process, and the process for site cleanups.










Bloomington Manufactured Gas Plant Site MGP Site and East Portion of Half Street


Book Description

This Remediation Objectives Report and Remedial Action Plan (ROR/RAP) presents recognized environmental conditions and related impacts identified at the Bloomington Manufactured Gas Plant (MGP) site and the adjacent east portion of Half Street and develops applicable remediation objectives and remedial actions.







Remediation of Manufactured Gas Plant Soils Contaminated with Free and Complex Cyanide


Book Description

Cyanide is one of the main contaminants present in soil from manufactured gas plants (MGP) . Several treatment methods including thermal treatment, chemical treatment, ultraviolet irradiation, and biological treatment were evaluated for their ability to degrade the cyanide present in these soils. In the thermal treatment, raising the temperature of the purified waste to 2000--3000C resulted in complete removal of complex cyanide from the soil; however, the cyanide emitted was in a the toxic gaseous HCN form. Chemical treatment, using the oxidant Fenton's reagent in a 10% soil slurry, resulted in the destruction of 80% of the free cyanide but little, if any, complex cyanide. Ultraviolet irradiation of the basic leachate from MGP wastes in the presence of the chelating agent EDTA yielded 90% degradation of the complex cyanide. For biological treatment, using an aerobic mixed culture, almost 60% of the free cyanide disappeared from the system with minimal degradation of the complex cyanide. Each treatment has its limitations. Thus, a combined physical-chemical-biological treatment in which the complex cyanide is degraded to free cyanide by photodegradation under alkaline conditions, the free cyanide then chemically (by Fenton's reagent) or biologically converted to NH3 and CO2, is proposed for the removal of cyanide from MGP sites.