Book Description
The Electrochemical Plant (ECP) is the one of the Russian Federation's four uranium enrichment plants and one of three sites in Russia blending high enriched uranium (HEU) into commercial grade low enriched uranium. ECP is located approximately 200 km east of Krasnoyarsk in the closed city of Zelenogorsk (formerly Krasnoyarsk- 45). DOE's MPC & A program first met with ECP in September of 1996. The six national laboratories participating in DOE's Material Protection Control and Accounting program are cooperating with ECP to enhance the capabilities of the physical protection, access control, and nuclear material control and accounting systems. The MPC & A work at ECP is expected to be completed during fiscal year 2001.