Maumee Bay State Park Shoreline Erosion Beach Restoration Study
Author :
Publisher :
Page : 26 pages
File Size : 12,56 MB
Release : 1984
Category :
ISBN :
Author :
Publisher :
Page : 26 pages
File Size : 12,56 MB
Release : 1984
Category :
ISBN :
Author : United States. Army. Corps of Engineers. Buffalo District
Publisher :
Page : pages
File Size : 50,49 MB
Release : 1982
Category :
ISBN :
Author : United States. Army. Corps of Engineers. Buffalo District
Publisher :
Page : pages
File Size : 49,33 MB
Release : 1983
Category : Coastal engineering
ISBN :
Author : United States. Army. Corps of Engineers. Buffalo District
Publisher :
Page : 380 pages
File Size : 23,97 MB
Release : 1981
Category : Coastal engineering
ISBN :
Author : United States. Army. Corps of Engineers. Buffalo District
Publisher :
Page : pages
File Size : 44,40 MB
Release : 1982
Category : Coastal engineering
ISBN :
Author : CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.
Publisher :
Page : 497 pages
File Size : 46,11 MB
Release : 1983
Category :
ISBN :
Appendices: Geotechnical Designs; Economic Evaluation; Cost Estimates; Design and Coastal Processes; Correspondence; Public Involvement; Fish and Wildlife Report; Cultural Resources; Environmental and Wetland Report; Public Views and Responses.
Author : CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.
Publisher :
Page : 193 pages
File Size : 20,77 MB
Release : 1983
Category :
ISBN :
The Ohio Department of Natural Resources (ODNR) is developing a multiuse facility on the shore of Lake Erie near Toledo, OH, called Maumee Bay State Park. They have requested Corps assistance in designing and cost-sharing structures to halt the severe shoreline erosion which is occuring, so that the park can be developed to its full potential. A plan for accomplishing the stated purpose has been developed. It would provide a protective sand beach, 250 feet wide by 5,500 feet long over the western half of the park, stabilized by eight 300-foot offshore rubblemound breakwaters. The eastern half of the park would be protected by a rubblemound revetment placed along existing shoreline, while the drainage ditches would be protected by rubblemound jetties. The plan recommended for construction is environmentally acceptable, engineeringly and economically feasible, and has an estimated first cost of $11.8 million. In addition, ODNR plans an expenditure of $3.3 million for associate development which will include a bathhouse, parking, and lands. Average annual benefits for the Federal Project and associated ODNR development are $5.7 million. With total annual charges of $1.7 million, the benefit-to-cost ration is 3.41 to 1.0. ODNR is fully supportive of the Corps shoreline protection plan. There is no known opposition to this plan or to the planned park development of the State.
Author :
Publisher :
Page : 474 pages
File Size : 32,59 MB
Release : 1984
Category :
ISBN :
Author : United States. Army. Corps of Engineers. Buffalo District
Publisher :
Page : pages
File Size : 34,32 MB
Release : 1983
Category :
ISBN :
Author : United States. Army. Corps of Engineers. Buffalo District
Publisher :
Page : 323 pages
File Size : 38,12 MB
Release : 1988
Category : Erosion
ISBN :