Navy Ddg-51 and Ddg-1000 Destroyer Programs and Issues for Congress


Book Description

The Navy's FY2013 budget submission calls for procuring nine Arleigh Burke (DDG-51) class destroyers in FY2013-FY2017, in annual quantities of 2-1-2-2-2. The five DDG-51s scheduled for procurement in FY2013-FY2015, and one of the two scheduled for procurement in FY2016, are to be of the current Flight IIA design. The Navy wants to begin procuring a new version of the DDG-51 design, called the Flight III design, starting with the second of the two ships scheduled for procurement in FY2016. The two DDG-51s scheduled for procurement in FY2017 are also to be of the Flight III design. The Flight III design is to feature a new and more capable radar called the Air and Missile Defense Radar (AMDR). The Navy this year is requesting congressional approval to use a multiyear procurement (MYP) arrangement for the nine DDG-51s scheduled for procurement in FY2013-FY2017.




Navy Ddg-51 and Ddg-1000 Destroyer Programs


Book Description

As part of its proposed FY2015 budget, the Navy is requesting funding for the procurement of two Arleigh Burke (DDG-51) class Aegis destroyers. The 10 DDG-51s programmed for procurement in FY2013-FY2017 (three ships in FY2013, one in FY2014, and two each in FY2015-FY2017) are being procured under a multiyear procurement (MYP) contract.




Navy Ddg-51 and Ddg-1000 Destroyer Programs


Book Description

This report presents background information and potential oversight issues for Congress on the Navy's Arleigh Burke (DDG-51) and Zumwalt (DDG-1000) class destroyer programs. The Navy procured DDG-51s from FY1985 through FY2005, and resumed procuring them in FY2010. The three DDG-51s requested for procurement in FY2019 are to be the 80th, 81st, and 82nd ships in the class. The Navy procured three DDG-1000s in FY2007-FY2009 and plans no further procurement of DDG-1000s. The 13 DDG-51s planned for procurement in FY2018-FY2022 are to be procured under a multiyear procurement (MYP) contract that Congress approved as part of its action on the Navy's FY2018 budget. DDG-51s procured in FY2017 and subsequent years are being built to a new design (the Flight III DDG-51 design), which incorporates a new and more capable radar called the Air and Missile Defense Radar (AMDR) or SPY-6 radar. The Navy estimates the combined procurement cost of the three DDG-51s requested for procurement in FY2019 at $5,292.7 million, or an average of $1,764.2 million each. The ships are to receive $39.4 million in prior-year (FY2018) Economic Order Quantity (EOQ) advance procurement (AP) funding (i.e., funding for up-front batch orders of components of DDG-51s to be procured under the FY2018-FY2022 MYP contract). The Navy's proposed FY2019 budget requests the following: the remaining $5,253.3 million in procurement funding needed to complete the estimated procurement cost for the three DDG-51s requested for FY2019; $391.9 million in additional EOQ AP funding for DDG-51s to be procured under the FY2018-FY2022 MYP contract; $54.0 million in cost-to-complete procurement funding to cover cost increases on DDG-51s procured in prior fiscal years; and $271.0 million in procurement funding to cover cost increases on Zumwalt (DDG-1000) class destroyers. Issues for Congress for FY2019 for the DDG-51 and DDG-1000 destroyer programs include the following: whether to approve, reject, or modify the Navy's FY2019 funding requests for the DDG-51 and DDG-1000 programs; whether to provide funding for the procurement of an additional DDG-51 (for a total procurement of four DDG-51s rather than three) in FY2019; continued cost growth in the DDG-1000 program; the Navy's intended shift in mission orientation for the DDG-1000s; cost, schedule, and technical risk in the Flight III DDG-51 effort; and the lack of an announced Navy roadmap for accomplishing three things in the cruiser-destroyer force: restoring ship growth margins; introducing large numbers of ships with integrated electric drive systems or other technologies that could provide ample electrical power for supporting future electrically powered weapons; and introducing technologies for substantially reducing ship operating and support (O&S) costs.




Navy Ddg-51 and Ddg-1000 Destroyer Programs


Book Description

This report presents background information and potential oversight issues for Congress on the Navy's Arleigh Burke (DDG-51) and Zumwalt (DDG-1000) class destroyer programs. The Navy's proposed FY2015 budget requests funding for the procurement of two DDG-51s. Decisions that Congress makes concerning these programs could substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.




Navy Ddg-51 and Ddg-1000 Destroyer Programs


Book Description

As part of its proposed FY2015 budget, the Navy is requesting funding for the procurement of two Arleigh Burke (DDG-51) class Aegis destroyers. The 10 DDG-51s programmed for procurement in FY2013-FY2017 (three ships in FY2013, one in FY2014, and two each in FY2015-FY2017) are being procured under a multiyear procurement (MYP) contract. The Navy estimates the combined procurement cost of the two DDG-51s requested for procurement in FY2015 at $2,969.4 million, or an average of $1,484.7 million each. The two ships have received a total of $297.9 million in prior-year advance procurement (AP) funding. The Navy's proposed FY2015 budget requests the remaining $2,671.4 million to complete the two ships' combined procurement cost. The Navy's proposed FY2015 budget also requests $129.1 million to complete the cost of one of the three DDG-51s funded in FY2013 (where a funding shortfall occurred as a result of the March 1, 2013, sequester on Department of Defense [DOD] programs), and $134.0 million in advance procurement (AP) funding for DDG-51s to be procured in future fiscal years, bringing the total requested for the DDG-51 program for FY2015 (excluding outfitting and post-delivery costs) to $2,934.6 million. The Navy's proposed FY2015 budget also requests $419.5 million in procurement funding to help complete the procurement cost of three Zumwalt (DDG-1000) class destroyers procured in FY2007-FY2009. The current version of the DDG-51 is called the Flight IIA design. The Navy wants to begin procuring a new version of the DDG-51 design, called the Flight III design, starting with the second of the two ships scheduled for procurement in FY2016. The Flight III design is to feature a new and more capable radar called the Air and Missile Defense Radar (AMDR). The Navy's proposed budget requests $144.7 million in research and development funding for the AMDR.




Navy DDG-1000 and DDG-51 Destroyer Programs: Background, Oversight Issues, and Options for Congress


Book Description

At a July 31, 2008, hearing before the Seapower and Expeditionary Forces subcommittee of the House Armed Services Committee, Navy officials announced a major change in the service's position on what kind of destroyers it wants to procure over the next several years: The Navy officials testified that the service no longer wants to procure additional Zunwalt (DDG-1000) class destroyers, and instead now wants to restart procurement of Arleigh Burke (DDG-51) destroyers. Prior to changing its position, the Navy had wanted to continue procuring DDG- 1000s, and did not want to procure any more DDG-51 Navy plans had called for procuring a total of seven DDG-1000s. The first two were procured in FY2007, and the Navy's proposed FY2009 budget, submitted to Congress in February 2008, requested finding for a third. The three DDG-51s procured in FY2005 were to have been the final ships in the DDG-51 program, and Navy budgets since FY2006 have included funding for closing out the DDG-51 program. Until the July 31 hearing, the Navy for several years had stressed the need for procuring additional DDG-1000s, defended the DDG-1000 program against various criticisms, and rejected proposals for stopping DDG-1000 procurement and for resuming procurement of DDG-51s.




Navy Destroyers


Book Description

This book presents background information and potential oversight issues for Congress on the Navy's Arleigh Burke (DDG-51) and Zumwalt (DDG-1000) class destroyer programs. The Navy's proposed FY2013 budget requests funding for the procurement of two DDG-51s. The Navy for FY2013 is also requesting congressional approval to use a multi-year procurement (MYP) arrangement for the nine DDG-51s scheduled for procurement in FY2013-FY2017. Decisions that Congress makes concerning these programs could substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.




Navy Aegis Ballistic Missile Defense (BMD) Program


Book Description

The Aegis BMD program gives Navy Aegis cruisers and destroyers a capability for conducting BMD operations. Under current plans, the number of BMD-capable Navy Aegis ships is scheduled to grow from 20 at the end of FY 2010 to 38 at the end of FY 2015. Contents of this report: (1) Intro.; (2) Background: Planned Quantities of Ships, Ashore Sites, and Interceptor Missiles; Aegis BMD Flight Tests; Allied Participation and Interest in Aegis BMD Program; (3) Issues for Congress: Demands for BMD-Capable Aegis Ships; Demands for Aegis Ships in General; Numbers of SM-3 Interceptors; SM-2 Block IV Capability for 4.0.1 and Higher Versions; (4) Legislative Activity for FY 2011. Charts and tables. This is a print on demand publication.




Navy Force Structure and Shipbuilding Plans


Book Description

Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.




Navy Large Unmanned Surface and Undersea Vehicles


Book Description

The Navy wants to develop and procure three new types of unmanned vehicles (UVs) in FY2020 and beyond-Large Unmanned Surface Vehicles (LUSVs), Medium Unmanned Surface Vehicles (MUSVs), and Extra-Large Unmanned Undersea Vehicles (XLUUVs). The Navy is requesting $628.8 million in FY2020 research and development funding for these three UV programs and their enabling technologies. The Navy wants to acquire these three types of UVs (which this report refers to collectively as large UVs) as part of an effort to shift the Navy to a new fleet architecture (i.e., a new combination of ships and other platforms) that is more widely distributed than the Navy's current architecture. Compared to the current fleet architecture, this more-distributed architecture is to include proportionately fewer large surface combatants (i.e., cruisers and destroyers), proportionately more small surface combatants (i.e., frigates and Littoral Combat Ships), and the addition of significant numbers of large UVs. The Navy wants to employ accelerated acquisition strategies for procuring these large UVs, so as to get them into service more quickly. The emphasis that the Navy placed on UV programs in its FY2020 budget submission and the Navy's desire to employ accelerated acquisition strategies in acquiring these large UVs together can be viewed as an expression of the urgency that the Navy attaches to fielding large UVs for meeting future military challenges from countries such as China. The LUSV program is a proposed new start project for FY2020. The Navy wants to procure two LUSVs per year in FY2020FY2024. The Navy wants LUSVs to be low-cost, high-endurance, reconfigurable ships based on commercial ship designs, with ample capacity for carrying various modular payloads-particularly anti-surface warfare (ASuW) and strike payloads, meaning principally anti-ship and land-attack missiles. The Navy reportedly envisions LUSVs as being 200 feet to 300 feet in length and having a full load displacement of about 2,000 tons. The MUSV program began in FY2019. The Navy plans to award a contract for the first MUSV in FY2019 and wants to award a contract for the second MUSV in FY2023. The Navy wants MUSVs, like LUSVs, to be low-cost, high-endurance, reconfigurable ships that can accommodate various payloads. Initial payloads for MUSVs are to be intelligence, surveillance and reconnaissance (ISR) payloads and electronic warfare (EW) systems. The Navy defines MUSVs as having a length of between 12 meters (about 39 feet) and 50 meters (about 164 feet). The Navy wants to pursue the MUSV program as a rapid prototyping effort under what is known as Section 804 acquisition authority. The XLUUV program, also known as Orca, was established to address a Joint Emergent Operational Need (JEON). The Navy wants to procure nine XLUUVs in FY2020-FY2024. The Navy announced on February 13, 2019, that it had selected Boeing to fabricate, test, and deliver the first four Orca XLUUVs and associated support elements. On March 27, 2019, the Navy announced that the award to Boeing had been expanded to include the fifth Orca. The Navy's large UV programs pose a number of oversight issues for Congress, including issues relating to the analytical basis for the more-distributed fleet architecture; the Navy's accelerated acquisition strategies and funding method for these programs; technical, schedule, and cost risk in the programs; the proposed annual procurement rates for the programs; the industrial base implications of the programs; the personnel implications of the programs; and whether the Navy has accurately priced the work it is proposing to do in FY2020 on the programs.