Project Planning and Scheduling Using Primavera Contractor Version 6. 1


Book Description

In plain English and in a logical sequence, Harris teaches planners and schedulers in any industry how to set up and use software in a project environment. He highlights the sources of information and the methods that should be employed to produce a realistic and useful project schedule.




Construction Scheduling with Primavera P6


Book Description

This book focuses on planning and scheduling for construction projects and presents field-site-based best practices related to schedule management and Primavera P6, and offers strategies that utilise scheduling methodologies and tools. These strategies are based on the theory of schedule management and features of scheduling software packages, which can be applied in every field site no matter what the construction project type is. This book introduces examples and tips, as well as suggestions for developing efficient schedules and management methods that ensure immediate improvement in schedule controlling. This book is designed to be Primavera P6 user-friendly, so readers using P6 can understand P6-based schedule management with ease. This book covers all matters schedulers should know and understand regarding schedule management. It also includes the missing manuals of schedule management textbooks and Primavera P6 manuals.




Project Management, Planning & Scheduling with Primavera P6


Book Description

Primavera P6 is one of the project management super tools that can have high potential for improving project success.There are many project management software tools in the market today. Unfortunately, many people who know the software have no idea how to use it. It is important to understand basic concepts of project management using a software tool like Primavera P6 that enables users to plan, schedule and control a large number of projects in a single software platform.This book was developed to accomplish two purposes. First, to provides a practical guide to using Primavera P6 to schedule and manage projects. Second, to introduce the required knowledge and skills to aid professionals wishing to achieve PMI-Scheduling Professional certification in Planning & Scheduling and Oracle Certification in Primavera P6 Enterprise Project Portfolio Manager to do so with ease.Oracle Primavera P6 Project Management module is comprehensive, scalable, multiproject planning and control software, built on Oracle or Microsoft SQL databases for organization-wide project management. It consists of role-specific tools to satisfy each team member's needs, responsibilities, and skills.




Construction Project Planning and Scheduling


Book Description

Intended for students and professionals in civil technology/engineering and construction management, Construction Project Planning and Scheduling presents complete coverage of the principles, techniques, and applications of all aspects of the scheduling process. "Some of the key features include: " Background discussion of the unique nature of scheduling construction projects and the need for sound, proven techniques. Coverage of the development and use of Work Breakdown Structure (WBS) as well as the transition from (WBS) to the elements of the project schedule. Use of real-world examples and applications to reinforce each scheduling principle. Informative illustrations and diagrams to support the text. Discussion of the development of Activity On the Node (RON) diagramming and scheduling techniques with multiple activity relationships.




Project Management, Planning and Control


Book Description

This fifth edition provides a comprehensive resource for project managers. It describes the latest project management systems that use critical path methods.




Oracle Primavera P6 Version 8


Book Description

This book is written in simple, easy to understand format with lots of screenshots and step-by-step explanations. If you are a Project manager or a consultant, who wants to master the core concepts of Primavera P6 and the new features associated with version 8, then this is the best guide for you. This book assumes that you have a fundamental knowledge of working in the Primavera P6 environment.




A Contractor's Guide to Planning, Scheduling, and Control


Book Description

A MUST-HAVE, PRACTICAL GUIDE THAT CONNECTS SCHEDULING AND CONSTRUCTION PROJECT MANAGEMENT In A Contractor’s Guide to Planning, Scheduling, and Control, an experienced construction professional delivers a unique and effective approach to the planning and scheduling responsibilities of a construction project manager, superintendent, or jobsite scheduler. The author describes the complete scheduling cycle, from preconstruction and scheduling through controls and closeout, from the perspective of real-world general contractors and scheduling professionals. Filled with tools and strategies that actually help contractors build projects, and light on academic jargon and terminology that’s not used in the field, the book includes examples of real craft workers and subcontractors, like electricians, carpenters, and drywallers, to highlight the concepts discussed within. Finally, an extensive appendix rounds out the book with references to additional resources for the reader. This comprehensive guide includes: Thorough introductions to construction contracting, lean construction planning, subcontractor management, and more A comprehensive exploration of a commercial case study that’s considered in each chapter, connecting critical topics with a consistent through line End-of-chapter review questions and applied exercises Access to a companion website that includes additional resources and, for instructors, solutions, additional case studies, sample estimates, and sample schedules Perfect for upper-level undergraduate students in construction management and construction engineering programs, A Contractor’s Guide to Planning, Scheduling, and Control is also an irreplaceable reference for general contractors and construction project management professionals.




Project Management for Facility Constructions


Book Description

This book describes concepts, methods and practical techniques for managing projects to develop constructed facilities in the fields of oil & gas, power, infrastructure, architecture and the commercial building industries. It is addressed to a broad range of professionals willing to improve their management skills and designed to help newcomers to the engineering and construction industry understand how to apply project management to field practice. Also, it makes project management disciplines accessible to experts in technical areas of engineering and construction. In education, this text is suitable for undergraduate and graduate classes in architecture, engineering and construction management, as well as for specialist and professional courses in project management.




Planning and Control Using Oracle Primavera P6 Versions 8 to 20 PPM Professional


Book Description

All scheduling software is difficult to learn for a number of reasons. None have the optimal settings when installed and Layouts, User Preferences and default options need to be adjusted to obtain the best possible performance. Usually the Help files do not connect the user to real life situations and do not explain the practical use of functions. Furthermore, there are many flicks and switches with obscure names that are difficult to understand or decide what they do or which are important. These issues make learning the software very difficult without a comprehensive guide written by an experienced user. Investing in a book written by Paul E Harris will address all these issues and allow you to setup the software properly and understand all the obscure functions letting you become productive more quickly and enhance your career opportunities and salary with a solid understanding of the software. This book is an update of the author’s Primavera P6 Version 8 to 19 book and contains a new section on Visualizer. The workshops have been updated so they start in the future. The book has been written so it may be used with any software industry version. The book is packed with screen shots, constructive tips and contains workshops with solutions at the end of each chapter for the reader to practice the skills taught. It has been written so it may be used with either the Professional Project Management Client version or the Enterprise Project Portfolio Management Optional Client. The book is aimed at: 1. People who wish learn the software but are unable to attend a training course and find the software reference manual hard going. 2. Project management companies who wish to run their own software training courses or provide their employees with an alternative text to the vendor supplied user manual. 3. Training organizations requiring a training manual to run their own training courses. The book is designed to teach planners and schedulers in any industry how to setup and use the software in a project environment. It explains in plain English and in a logical sequence, the steps required to create and maintain an unresourced and resourced schedule. It tackles some of the more complex aspects of the software that the user manual does not address. It highlights the sources of information and the methods that should be employed to produce a realistic and useful project schedule. The book provides advice on how on how the many software options may be applied to projects environments and it aims to teach readers how to plan and control projects created within the software package and stays focused on explaining how to use Primavera to schedule projects by: Concentrating on the core functions required to set up an enterprise environment and how to plan and control projects. Providing command lists at the start of each chapter as a quick reference. Providing a comprehensive table of contents and index of all topics. The book is intended to be used: As a self-teach book, or A user guide, or A training manual for a three-day training course. This book is written by an experienced scheduler, who has used the software at the sharp end of projects and is not a techo. It draws on the author's practical experience in using the software in a wide variety of industries. It presents workable solutions to real day to day planning and scheduling problems and contains practical advice on how to set up the software and import data.




Construction Project Scheduling and Control


Book Description

An easy-to-follow guide to the theory and practice of project scheduling and control No matter how large or small the construction project, an efficient, well-thought-out schedule is crucial to achieving success. The schedule manages all aspects of a job, such as adjusting staff requirements at various stages, overseeing materials deliveries and equipment needs, organizing inspections, and estimating time needs for curing and settling—all of which requires a deep understanding on the part of the scheduler. Written by a career construction professional, Construction Project Scheduling and Control, Second Edition has been fully revised with up-to-date coverage detailing all the steps needed to devise a technologically advanced schedule geared toward streamlining the construction process. Solved and unsolved exercises reinforce learning, while an overview of industry standard computer software sets the tone for further study. Some of the features in this Second Edition include: Focus on precedence networks as a viable solution to scheduling, the main part of project control The concepts of Dynamic Minimal Lag, a new CPM technique developed by the author A new chapter on schedule risk management By combining basic fundamentals with advanced techniques alongside the robust analysis of theory to enhance real-world applications, Construction Project Scheduling and Control is an ideal companion for students and professionals looking to formulate a schedule for a time-crunched industry in need of better ways to oversee projects.