Reconnaissance Report for Hydropower


Book Description







Lock & Dam 5, Mississippi River Near Minneiska, Minnesota. Reconnaissance Report for Hydropower


Book Description

This report presents a preliminary evaluation of the addition of hydropower at the existing navigation Lock and Dam 5. The study shows that installation of a hydroplant with a 6,000-kW (kilowatt), 8,400-kW, or 10,800-kW nameplate rating is economical. Pertinent data concerning the site and potential hydropower installations are given. Severe environmental impacts are not necessarily associated with construction of a plant of the sizes investigated despite the proxity of the lock and dam to an environmentally sensitive area. The District Engineer recommends that the Corps of Engineers prepare a feasibility report which can serve as a basis for congressional authorization for hydropower plant construction at lock and dam 5.




Reconnaissance Report for Hydropower


Book Description










Reconnaissance Report for Hydropower


Book Description







Reconnaissance Report for Hydropower


Book Description