Book Description
Drawings prepared for the Denver Radium Superfund Site Remedial Action Project for the use of the U.S. Environmental Protection Agency and the U.S. Department of Energy.
Author : Geotech, Inc
Publisher :
Page : 8 pages
File Size : 28,43 MB
Release : 1990*
Category : Hazardous waste site remediation
ISBN :
Drawings prepared for the Denver Radium Superfund Site Remedial Action Project for the use of the U.S. Environmental Protection Agency and the U.S. Department of Energy.
Author : United States. Environmental Protection Agency
Publisher :
Page : 11 pages
File Size : 14,36 MB
Release : 1990*
Category : Hazardous waste site remediation
ISBN :
Drawings prepared for the Denver Radium Superfund Site Remedial Action Project for the use of the U.S. Environmental Protection Agency and the U.S. Department of Energy.
Author : Geotech, Inc
Publisher :
Page : 27 pages
File Size : 13,37 MB
Release : 1990
Category : Hazardous waste site remediation
ISBN :
Drawings prepared for the Denver Radium Superfund Site Remedial Action Project for the use of the U.S. Environmental Protection Agency and the U.S. Department of Energy.
Author : Geotech, Inc
Publisher :
Page : 4 pages
File Size : 49,76 MB
Release : 1990
Category : Hazardous waste site remediation
ISBN :
Drawings prepared for the Denver Radium Superfund Site Remedial Action Project for the use of the U.S. Environmental Protection Agency and the U.S. Department of Energy.
Author : Geotech, Inc
Publisher :
Page : 72 pages
File Size : 40,50 MB
Release : 1989
Category : Hazardous waste site remediation
ISBN :
Author : Geotech, Inc
Publisher :
Page : pages
File Size : 47,60 MB
Release : 1990
Category : Hazardous waste site remediation
ISBN :
Author : R. P. Wells
Publisher :
Page : pages
File Size : 16,59 MB
Release : 2006
Category :
ISBN :
The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.
Author :
Publisher :
Page : pages
File Size : 16,31 MB
Release : 1995
Category : Hazardous waste sites
ISBN :
Author :
Publisher :
Page : 732 pages
File Size : 34,38 MB
Release : 1991
Category : Hazardous waste sites
ISBN :
Author :
Publisher :
Page : 240 pages
File Size : 33,4 MB
Release : 1992
Category :
ISBN :