Remedial Action Construction Drawings for Operable Unit III, Phase A


Book Description

Drawings prepared for the Denver Radium Superfund Site Remedial Action Project for the use of the U.S. Environmental Protection Agency and the U.S. Department of Energy.







Remedial Action Construction Drawings for Operable Unit I, Phase C


Book Description

Drawings prepared for the Denver Radium Superfund Site Remedial Action Project for the use of the U.S. Environmental Protection Agency and the U.S. Department of Energy.




Remedial Action Construction Drawings for Operable Unit IV/V, Phase C


Book Description

Drawings prepared for the Denver Radium Superfund Site Remedial Action Project for the use of the U.S. Environmental Protection Agency and the U.S. Department of Energy.




Operable Unit III, Phase A


Book Description







Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III.


Book Description

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.










EPA-540/R.


Book Description