FY2003 ANNUAL SUMMARY REPORT FOR THE IN SITU REDOX MANIPULATION OPERATIONS.


Book Description

This annual progress and performance report discusses the In Situ Redox (reduction-oxidation) Manipulation (ISRM) interim medial action at the 100-HR-3 Operable Unit (OU) from October 1, 2002, through September 30, 2003 (FY 2003). This report specifically addresses remedial actions performed at the hexavalent chromium plume in the southwest portion of the 100-D Area. Interim pump-and-treat remedial actions performed at the northeast portion of the 100-D and 100-H Area will be discussed in a separate annual summary report. This is the fourth annual summary report that specifically addresses the ISRM remediation technology presently being installed in this portion of the 100-D Area, as specified in Remedial Design Report and Remedial Action Work Plan for the 100-HR-3 Groundwater Operable Unit In Situ Redox Manipulation (RDR/RAWP) (DOE-RL 2000). The ISRM technology involves creating a permeable subsurface treatment zone by injecting sodium dithionite into the aquifer, which creates a chemically reduced environment. Hexavalent chromium passing through the treatment zone is reduced to less toxic and less mobile trivalent chromium.



















In Situ Redox Manipulation Treatability Test -- Waste Management Plan


Book Description

This Waste Management Plan provides guidance for the management of waste generated from groundwater well installations in the 100-HR-3 Operable Unit. The well installations are necessary to implement the In Situ Redox Manipulation Treatability Test to determine methods for in situ remedial efforts to prevent discharge of hexavalent chromium at levels above those considered protective of aquatic life in the Columbia River and riverbed sediments.




Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan


Book Description

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.




Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater Remedial Design


Book Description

This Remedial Design/Remedial Action (RD/RA) Scope of Work pertains to OU 3-14 Idaho Nuclear Technology and Engineering Center and the Idaho National Laboratory and identifies the remediation strategy, project scope, schedule, and budget that implement the tank farm soil and groundwater remediation, in accordance with the May 2007 Record of Decision. Specifically, this RD/RA Scope of Work identifies and defines the remedial action approach and the plan for preparing the remedial design documents.