Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program


Book Description

Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.







Quality Assurance Plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee


Book Description

This quality assurance plan summarizes requirements for conducting work on the Upper East 9 Fork Poplar Creek (UEFPC) Characterization Area (CA). The reader is referred to the Expanded Task Work Agreement for Upper East Fork Poplar Creek Characterization Area, Remedial Investigation/Feasibility Study (RI/FS) for details regarding the activities, roles, and responsibilities summarized here. UEFPC is designated a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site and thus requires a remedial investigation (RI) and a feasibility study (FS). The RI objectives are to evaluate the nature and extent of known and suspected contaminates, to provide data to perform baseline ecological and human health risk assessments, and to support development and evaluation of remedial alternatives for the FS, . Existing data will be used as much as possible. Additional sampling may be required to fill data gaps. The goal of the RI is to prioritize the major sources of contaminants to exit pathways and to understand their characteristics for risk characterization and development of remedial alternatives. The FS objectives are to investigate technologies and develop and evaluate alternatives based on 2031 CERCLA guidance.




The Office of Environmental Management Technical Reports: A Bibliography


Book Description

The Office of Environmental Management's (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1994 through June 30, 1995. This information is divided into the following categories: Focus Areas, Cross-Cutting Programs, and Support Programs. In addition, a category for general information is included. EM's Office of Science and Technology sponsors this bibliography.