Christlob Mylius


Book Description













Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12


Book Description

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).




RI/FS Field Sampling Plan


Book Description




Final Task Order Work Plan, Area of Contamination (AOC) 57, 63AX, and 69W, Data Item A002. Fort Devens Remedial Investigations/Feasibility Study Final Work Plan, Group 2


Book Description

Site Investigations (SIs) were conducted by ABB Environmental Services, Inc. (ABB-ES) at Fort Devens between May 1992 and January 1994 at twelve Study Areas (SAs) and nineteen historic gas station sites in Groups 2 and 7. As a result of the SI for SA 57 in Group 2, SA 57 was divided into two areas of concern. Area 1 was identified as the storm drain outfall (at Cold Spring Brook) which drained the Building 3713 area. Area 2 was defined as the drainage swale associated with Building 3757, and immediate surrounding area, including a portion of Cold Spring Brook downstream from Area 1. Area 1 has subsequently been included for study under the installation-wide AREES-70 storm water study. Based on the SI findings, and results of a subsequent removal action, a remedial investigation and feasibility study (RI/FS) has been recommended at SA 57/Area 2. This Draft Work Plan provides a history of investigation activities and findings at SA 57, and outlines proposed plans for the RI/FS. In this Work Plan and all subsequent plans and reports, SA 57 will be referred to as Area of Contamination (AOC) 57. ABB-ES will conduct RI and FS activities at AOC 57 in accordance with the plans and rationale presented in the Work Plan and in conformance to the methods, procedures, and requirements set forth in the Final Project Operations Plan (POP) prepared by ABB-ES for activities conducted at Fort Devens.




Jefferson Proving Ground RI/FS Samplimg Design Plan


Book Description

The purpose of this Sampling Design Plan is to provide a plan for the field sampling and laboratory analysis to be performed in support of Remedial Action/Feasibility Studies (RI/FS) at Jefferson Proving Ground (JPG), Madison, Indiana. Included in this plan are activities designed to fulfill the requirements of a Screening Site Inspection (SSI). This plan is intended to be a guide that incorporates specific rationale and objectives for each sampling and analysis activity, sampling protocols and procedures, data and document management, and data interpretation and evaluation. Also included are logistics and schedule for the proposed RI field activities.