Nuclear Power


Book Description

The construction of nuclear power plants in the United States is stopping, as regulators, reactor manufacturers, and operators sort out a host of technical and institutional problems. This volume summarizes the status of nuclear power, analyzes the obstacles to resumption of construction of nuclear plants, and describes and evaluates the technological alternatives for safer, more economical reactors. Topics covered include: Institutional issues-including regulatory practices at the federal and state levels, the growing trends toward greater competition in the generation of electricity, and nuclear and nonnuclear generation options. Critical evaluation of advanced reactors-covering attributes such as cost, construction time, safety, development status, and fuel cycles. Finally, three alternative federal research and development programs are presented.







Future of Nuclear Power


Book Description







National Energy Policy


Book Description




The Future of Nuclear Power in the United States


Book Description

This paper examines the economic and regulatory challenges that must be faced by potential investors in new nuclear power plants in the United States. The historical development of the existing fleet of over 100 nuclear plants and their recent performance history are discussed. The pattern of re-licensing of existing plants and the implications for the role of the extended operation of the existing fleet in the overall electricity supply portfolio over the next 50 years is examined. The economic competitiveness of investments in new nuclear power plants compared to investments in alternative base load technologies is discussed under a variety of assumptions about construction costs, fuel costs, competitive and economic regulatory environments and various levels of carbon emissions prices affected competing fossil-fueled technologies. Federal government efforts to facilitate investment in new nuclear power plants, including streamlined licensing procedures and financial incentive provided by the Energy Policy Act of 2005 are discussed. These regulatory changes and financial incentives improve the economic competitiveness of nuclear power. First mover plants that can benefit from federal financial incentives are most likely to be built in states that continue to regulate generating plants based on cost-of-service principles, transferring construction cost and operating performance risks to consumers, and where there is room on existing sites to build additional nuclear capacity. Once federal financial incentives come to an end lower and more stable construction costs combined with carbon emissions charges are likely to be necessary to make investments in new nuclear plants significantly more attractive than investments in pulverized coal plants. Unresolved waste disposal policies and local opposition to new nuclear plants are likely to represent barriers to investment in new nuclear power plants in some areas of the country.







Nuclear Regulation


Book Description




Risk-informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants. Annual Report


Book Description

OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants.