Author : United States. Federal Energy Regulatory Commission
Publisher :
Page : 224 pages
File Size : 24,2 MB
Release : 1978
Category : Electric power failures
ISBN :
Book Description
"On July 13, 1977 the entire electric load of the Con Edison system was lost, plunging New York City and Westchester County into darkness. The collapse resulted from a combination of natural events, equipment malfunctions, questionable system-design features, and operating errors. An attempt is made in this report to answer the following: what were the specific causes of the failure; if equipment malfunctions and operator errors contributed, could they have been prevented; to what extent was Con Edison prepared to handle such an emergency; and did Con Edison plan prudently reserve generation, for reserve transmission capability, for automatic equipment to protect its system, and for proper operator response to a critical situation. Following the introductory and summary section, additional sections include: the Consolidated Edison system; prevention of bulk power-supply interruptions; the sequence of failure and restoration; analysis of the July 1977 power failure; restoration sequence and equipment damage assessment; and other investigations of the blackout"--OSTI record abstract.