Waste Isolation Pilot Plant (WIPP) Conceptual Design Report. Part III. Drawings
Author :
Publisher :
Page : pages
File Size : 30,3 MB
Release : 1977
Category :
ISBN :
Author :
Publisher :
Page : pages
File Size : 30,3 MB
Release : 1977
Category :
ISBN :
Author :
Publisher :
Page : pages
File Size : 22,91 MB
Release : 1977
Category :
ISBN :
The pilot plant is developed for ERDA low-level contact-handled transuranic waste, ERDA remote-handled intermediate-level transuranic waste, and for high-level waste experiments. All wastes placed in the WIPP arrive at the site processed and packaged; no waste processing is done at the WIPP. All wastes placed into the WIPP are retrievable. The proposed site for WIPP lies 26 miles east of Carlsbad, New Mexico. This document includes the executive summary and a detailed description of the facilities and systems. (DLC).
Author :
Publisher :
Page : pages
File Size : 41,60 MB
Release : 1977
Category : Radioactive waste disposal in the ground
ISBN :
Author :
Publisher :
Page : pages
File Size : 49,59 MB
Release : 1977
Category :
ISBN :
The cost worksheets for the Waste Isolation Pilot Plant (WIPP) are presented. A summary cost estimate, cost estimate for surface facilities, and cost estimate for shafts and underground facilities are included. (DC).
Author :
Publisher :
Page : pages
File Size : 20,60 MB
Release : 1977
Category :
ISBN :
The types of accidents or risks pertinent to the Waste Isolation Pilot Plant (WIPP) are presented. Design features addressing these risks are discussed. Also discussed are design features that protect the public. (DC).
Author :
Publisher :
Page : pages
File Size : 40,27 MB
Release : 1977
Category :
ISBN :
The Federal Mine Safety Code, Part 57 of the Federal Metal and Nonmetallic Mine Safety Act, was studied as to its effects upon the design and operation of that portion of the waste Isolation Pilot Plant pertaining to mining. These standards are discussed on a point by point basis.
Author :
Publisher :
Page : pages
File Size : 32,32 MB
Release : 1977
Category :
ISBN :
The electrical load summary for the Waste Isolation Pilot Plant (WIPP) is presented. (DC).
Author :
Publisher :
Page : pages
File Size : 34,50 MB
Release : 1977
Category :
ISBN :
This addendum outlines the planned development program for equipment, identified and conceptually shown in the Waste Isolation Pilot Plant (WIPP) Conceptual Design Report (CDR), that is required for storage emplacement and retrieval of all wastes accepted at the WIPP.
Author :
Publisher :
Page : 722 pages
File Size : 28,64 MB
Release : 1980
Category :
ISBN :
Author :
Publisher :
Page : pages
File Size : 29,56 MB
Release : 1977
Category :
ISBN :
The design calculations for the Waste Isolation Pilot Plant (WIPP) are presented. The following categories are discussed: general nuclear calculations; radwaste calculations; structural calculations; mechanical calculations; civil calculations; electrical calculations; TRU waste surface facility time and motion analysis; shaft sinking procedures; hoist time and motion studies; mining system analysis; mine ventilation calculations; mine structural analysis; and miscellaneous underground calculations.