Waste Isolation Pilot Plant (WIPP) Conceptual Design Report. Part III. Drawings
Author :
Publisher :
Page : pages
File Size : 18,55 MB
Release : 1977
Category :
ISBN :
Author :
Publisher :
Page : pages
File Size : 18,55 MB
Release : 1977
Category :
ISBN :
Author :
Publisher :
Page : pages
File Size : 36,38 MB
Release : 1977
Category : Radioactive waste disposal in the ground
ISBN :
Author :
Publisher :
Page : pages
File Size : 14,88 MB
Release : 1977
Category :
ISBN :
The pilot plant is developed for ERDA low-level contact-handled transuranic waste, ERDA remote-handled intermediate-level transuranic waste, and for high-level waste experiments. All wastes placed in the WIPP arrive at the site processed and packaged; no waste processing is done at the WIPP. All wastes placed into the WIPP are retrievable. The proposed site for WIPP lies 26 miles east of Carlsbad, New Mexico. This document includes the executive summary and a detailed description of the facilities and systems. (DLC).
Author : U.S. Nuclear Regulatory Commission
Publisher :
Page : 252 pages
File Size : 44,91 MB
Release : 1980
Category : Nuclear energy
ISBN :
Author :
Publisher :
Page : pages
File Size : 50,88 MB
Release : 1977
Category :
ISBN :
The Aerojet Manufacturing Company (AMCO) received a contract in November 1976 to provide consulting services in assisting Holmes and Narver, Incorporated with the conceptual designs, cost estimates, and schedules of equipment used to handle waste casks, to decontaminate waste canisters and to overpack damaged or highly contaminated waste canisters for the Waste Isolation Pilot Plant (WIPP). Also, the layout of the hot cell in which canister handling, overpack and decontamination takes place was to be reviewed along with the time and motion study of the cell operations. This report has been prepared to present the results of the efforts and contains all technical and planning data developed during the program. The contents of this report are presented in three sections: (1) comments on the existing design criteria, equipment conceptual designs, hot cell design and time and motion studies of projected hot cell activities; (2) design descriptions of the equipment concepts and justification for varying from the existing concept (if a variation occurred). Drawings of each concept are provided in Appendix A. These design descriptions and drawings were used as the basis for the cost estimates; and (3) schedule projections and cost estimates for the equipment described in Section 2. Detail cost estimate backup data is provided in Appendix B.
Author :
Publisher :
Page : 490 pages
File Size : 41,25 MB
Release : 1993
Category : Power resources
ISBN :
Author :
Publisher :
Page : pages
File Size : 10,60 MB
Release : 1977
Category :
ISBN :
The cost worksheets for the Waste Isolation Pilot Plant (WIPP) are presented. A summary cost estimate, cost estimate for surface facilities, and cost estimate for shafts and underground facilities are included. (DC).
Author :
Publisher :
Page : pages
File Size : 32,27 MB
Release : 1977
Category :
ISBN :
The electrical load summary for the Waste Isolation Pilot Plant (WIPP) is presented. (DC).
Author :
Publisher :
Page : pages
File Size : 26,44 MB
Release : 1977
Category :
ISBN :
The types of accidents or risks pertinent to the Waste Isolation Pilot Plant (WIPP) are presented. Design features addressing these risks are discussed. Also discussed are design features that protect the public. (DC).
Author :
Publisher :
Page : pages
File Size : 23,92 MB
Release : 1977
Category :
ISBN :
The Federal Mine Safety Code, Part 57 of the Federal Metal and Nonmetallic Mine Safety Act, was studied as to its effects upon the design and operation of that portion of the waste Isolation Pilot Plant pertaining to mining. These standards are discussed on a point by point basis.