Weapons Acquisition: DoD Should Strengthen Policies for Assessing Technical Data Needs to Support Weapon Systems


Book Description

Army and the Air Force have encountered limitations in their sustainment plans for some fielded weapon systems because they lacked needed technical data rights. The lack of technical data rights has limited the services flexibility to make changes to sustainment plans that are aimed at achieving cost savings and meeting legislative requirements regarding depot maintenance capabilities. During our review we identified seven Army and Air Force weapon system programs where these military services encountered limitations in implementing revisions to sustainment plans C-17 aircraft, F-22 aircraft, C-130J aircraft, Up-armored High- Mobility Multipurpose Wheeled Vehicle (HMMWV), Stryker family of vehicles, Airborne Warning and Control System (AWACS) aircraft, and M4 carbine. Although the circumstances surrounding each case were unique, earlier decisions made on technical data rights during system acquisition were cited as a primary reason for the limitations subsequently encountered. As a result of the limitations encountered due to the lack of technical data rights, the services had to alter their plans for developing maintenance capability at public depots, new sources of supply to increase production, or competitive offers for the acquisition of spare parts and components to reduce sustainment costs. For example, the Air Force identified a need to develop a capability to perform maintenance on the C-17 at government depots but lacked the requisite technical data rights. Consequently, the Air Force is seeking to form partnerships with C-17 subvendors to develop its depot maintenance capability. Its efforts to form these partnerships have had mixed results, according to Air Force officials, because some sub-vendors have declined to provide the needed technical data.




Weapons Acquisition


Book Description

A critical element in the life cycle of a weapon system is the availability of the item's technical data-recorded information used to define a design and to produce, support, maintain, or operate the item. Because a weapon system may remain in the defense inventory for decades following initial acquisition, technical data decisions made during acquisition can have far-reaching implications over its life cycle. In August 2004, GAO recommended that the Department of Defense (DOD) consider requiring program offices to develop acquisition strategies that provide for future delivery of technical data should the need arise to select an alternative source for logistics support or to offer the work out for competition. For this review, GAO (1) evaluated how sustainment plans for Army and Air Force weapon systems had been affected by technical data rights and (2) examined requirements for obtaining technical data rights under current DOD acquisition policies.




Weapons Acquisition


Book Description

The U.S. Government Accountability Office (GAO) is an independent agency that works for Congress. The GAO watches over Congress, and investigates how the federal government spends taxpayers dollars. The Comptroller General of the United States is the leader of the GAO, and is appointed to a 15-year term by the U.S. President. The GAO wants to support Congress, while at the same time doing right by the citizens of the United States. They audit, investigate, perform analyses, issue legal decisions and report anything that the government is doing. This is one of their reports.




Gao-06-839 Weapons Acquisition


Book Description

GAO-06-839 Weapons Acquisition: DOD Should Strengthen Policies for Assessing Technical Data Needs to Support Weapon Systems




Weapons Acquisition


Book Description




Defense Acquisition: DoD Should Clarify Requirements for Assessing and Documenting Technical-Data Needs


Book Description

Some DoD weapon systems remain in the inventory for decades. Therefore, decisions that program officials make during the acquisition process to acquire or not acquire rights to technical data (TD) can have far-reaching implications for DoD's ability to sustain and competitively procure parts and services for those systems. DoD needs access to TD to control costs, maintain flexibility in acquisition and sustainment, and maintain and operate systems. This report reviews the extent to which: (1) DoD has updated its acquisition and procurement policies; (2) selected acquisition programs adhered to requirements to document TD needs; and (3) DoD took actions to improve TD decisions by program managers. Illus. This is a print on demand report.




Weapon Systems Handbook


Book Description

July 2019 Printed in BLACK AND WHITE The Army's Weapon Systems Handbook was updated in July 2019, but is still titled "Weapon Systems Handbook 2018." We are printing this in black and white to keep the price low. It presents many of the acquisition programs currently fielded or in development. The U.S. Army Acquisition Corps, with its 36,000 professionals, bears a unique responsibility for the oversight and systems management of the Army's acquisition lifecycle. With responsibility for hundreds of acquisition programs, civilian and military professionals collectively oversee research, development and acquisition activities totaling more than $20 billion in Fiscal Year 2016 alone. Why buy a book you can download for free? We print this so you don't have to. We at 4th Watch Publishing are former government employees, so we know how government employees actually use the standards. When a new standard is released, somebody has to print it, punch holes and put it in a 3-ring binder. While this is not a big deal for a 5 or 10-page document, many DoD documents are over 400 pages and printing a large document is a time- consuming effort. So, a person that's paid $25 an hour is spending hours simply printing out the tools needed to do the job. That's time that could be better spent doing mission. We publish these documents so you can focus on what you are there for. It's much more cost-effective to just order the latest version from Amazon.com. SDVOSB If there is a standard you would like published, let us know. Our web site is usgovpub.com




Defense Management: DoD Needs to Reexamine Its Extensive Reliance on Contractors and Continue to Improve Management and Oversight


Book Description

The fed. gov¿t., incl. the DoD, is relying on contractors to carry out many of its missions. Governmentwide spending on contractor services has more than doubled in the last 10 years. DoD has used contractors extensively to support troops deployed abroad; there are about 196,000 contractors in Iraq and Afghanistan. While contractors can play an important role in helping agencies accomplish their missions, there have been problems regarding the appropriate role and mgmt. of contractors, particularly at DoD. This testimony highlights the challenges DoD has had in managing its increased reliance on contractors who support deployed troops and who provide logistics support for weapons. Includes recommendations.




Statistics, Testing, and Defense Acquisition


Book Description

For every weapons system being developed, the U.S. Department of Defense (DOD) must make a critical decision: Should the system go forward to full-scale production? The answer to that question may involve not only tens of billions of dollars but also the nation's security and military capabilities. In the milestone process used by DOD to answer the basic acquisition question, one component near the end of the process is operational testing, to determine if a system meets the requirements for effectiveness and suitability in realistic battlefield settings. Problems discovered at this stage can cause significant production delays and can necessitate costly system redesign. This book examines the milestone process, as well as the DOD's entire approach to testing and evaluating defense systems. It brings to the topic of defense acquisition the application of scientific statistical principles and practices.




Status of GAO Recommendations to the Department of Defense (Fiscal Years 2001-2007)


Book Description

A report to congressional committees regarding the DoD¿s progress in implementing GAO's recommendations over the last 7 years. During this period of time, GAO issued 637 reports to DoD that included 2,726 recommendations. By law, agencies, including DoD, are required to submit written statements explaining actions taken in response to recommendations that have been made. This report contains the results of an analysis on the implementation status of the 2,726 recommendations made to DoD in reports issued during FY 2001 through 2007. Includes examples of related financial accomplishments reported for the period, based on DoD-related work. Illustrations.