Phase I Remedial Investigation Report for the 300-FF-5 Operable Unit, Volume 1


Book Description

The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.






















Phase 1, Remedial Investigation Report for the 300-FF-5 Operable Unit


Book Description

Volume two contains the following appendices: 300-FF-5 spring, sediment, Columbia River -- water and spring groundwater well analytical data; 300-FF-5 borehole soil analytical data; 300-FF-5 groundwater analytical data for 1st, 2nd, 3rd, and 4th sampling rounds; numerical groundwater flow and transport modeling; pertinent correspondence; data quality summary; monthly potentiometric surface contour maps of the unconfined aquifer in the 300-FF-5 operable unit; applicable or relevant and appropriate requirements; calculations of estimated future groundwater concentrations resulting from 300-FF-1 soil contamination; risk assessment example calculations; plume maps for 300-FF-5 operable unit contaminants of potential concern; analytical model input; and toxicity profiles for contaminants of potential concern at the 300-FF-5 operable unit.




Final Report


Book Description




Data Compilation Task Report for the Source Investigation of the 300-FF-1 Operable Unit Phase 1 Remedial Investigation


Book Description

This report provides additional information on facility and waste characteristics for the 300-FF-1 operable unit. The additional information gathered and reported includes meetings and on-site visits with current and past personnel having knowledge of operations in the operable unit, a more precise determination of the location of the Process Sewer lines and Retired Radioactive Liquid Waste Sewer, a better understanding of the phosphoric acid spill at the 340 Complex, and a search for engineering plans and environmental reports related to the operable unit. As a result of this data-gathering effort, recommendations for further investigation include characterization of the 307 Trenches to determine the origin of an underlying uranium plume in the groundwater, more extensive sampling of near-surface and dike sediments in the North and South Process Ponds to better define the extent of horizontal contamination, and detection of possible leaks in the abandoned Radioactive Waste Sewer by either electromagnetic induction or remote television camera inspection techniques. 16 refs., 4 figs., 5 tabs.