New York State Superfund Contract Phase II Remedial Investigation Report
Author : Lawler, Matusky & Skelly Engineers
Publisher :
Page : pages
File Size : 25,74 MB
Release : 1997
Category : Groundwater
ISBN :
Author : Lawler, Matusky & Skelly Engineers
Publisher :
Page : pages
File Size : 25,74 MB
Release : 1997
Category : Groundwater
ISBN :
Author : Dvirka & Bartilucci
Publisher :
Page : pages
File Size : 36,54 MB
Release : 1998
Category : Buffalo (N.Y.)
ISBN :
Author : Dames & Moore
Publisher :
Page : 0 pages
File Size : 42,25 MB
Release : 1992
Category : Ammunition
ISBN :
This Phase 2 (PH2) Remedial Investigation (RI) report was prepared for selected study sites at the LAP Area of Joliet Army Ammunition Plant (JAAP), Joliet, Illinois. This report was prepared in accordance with the Federal Facilities Agreement (FAA) between the U.S. Army Environmental Center (USAEC; formerly USATHAMA), U.S. Environmental Protection Agency (EPA) Region V, and Illinois EPA. The report presents the results of the PH2 field investigation. The purpose of the report is to present the findings of sampling that was conducted to fill data gaps identified at the completion of the Phase 1 field activities. This report defines the nature and extent of contamination at thirteen study areas, Prairie Creek, Doyle Lake and Jordan Creek. All previous collected data from these areas is also summarized.
Author : Canonie Environmental (Firm)
Publisher :
Page : pages
File Size : 50,74 MB
Release : 1988
Category : Groundwater
ISBN :
Author :
Publisher :
Page : 280 pages
File Size : 13,67 MB
Release : 1994
Category :
ISBN :
Phase 2 of a remedial investigation (RI) has been conducted at the U.S. Army Materials Technology Laboratory (MTL) in Watertown, Massachusetts. The U.S. Army Environmental Center, New England Division, contracted with Roy F. Weston, Inc. (WESTON) under the Base Closure Program Contract Number DAA15-9O-D-0009, Task Order 1, to complete, among other tasks, the Phase 2 RI at MTL. After the Phase 1 RI was initiated, MTL was recommended for closure by the Defense Secretary's Commission on Base Realignment and Closures. The original objectives of the Phase 1 RI did not include assessing concerns associated with future unlimited use of the site by the public after the closure of MTL. To do so, sampling in buildings, as well as more extensive environmental sampling and risk assessment, was required. This additional information was collected during the Phase 2 RI to properly evaluate potential remedial measures that would allow subsequent land use consistent with assigned reuse.
Author :
Publisher :
Page : 506 pages
File Size : 39,96 MB
Release : 1995
Category : Groundwater
ISBN :
Author : Dames & Moore
Publisher :
Page : pages
File Size : 34,96 MB
Release : 1992
Category : Ammunition
ISBN :
This Phase 2 (PH2) Remedial Investigation (RI) report was prepared for selected study sites at the LAP Area of Joliet Army Ammunition Plant (JAAP), Joliet, Illinois. This report was prepared in accordance with the Federal Facilities Agreement (FAA) between the U.S. Army Environmental Center (USAEC; formerly USATHAMA), U.S. Environmental Protection Agency (EPA) Region V, and Illinois EPA. The report presents the results of the PH2 field investigation. The purpose of the report is to present the findings of sampling that was conducted to fill data gaps identified at the completion of the Phase 1 field activities. This report defines the nature and extent of contamination at thirteen study areas, Prairie Creek, Doyle Lake and Jordan Creek. All previous collected data from these areas is also summarized.
Author : Tetra Tech EM Inc
Publisher :
Page : pages
File Size : 50,98 MB
Release : 1999
Category : Environmental impact statements
ISBN :
Author : Peerless Photo Products
Publisher :
Page : pages
File Size : 46,29 MB
Release : 1998
Category : Groundwater
ISBN :
Author : New Jersey. Department of Environmental Protection and Energy
Publisher :
Page : pages
File Size : 17,89 MB
Release : 1993
Category : Factory and trade waste
ISBN :