Book Description
Excerpt from Standard Specifications for Steel Railway Bridges (Fixed Spans), 1922 Izb. After the contract has been awarded and before any materials are ordered the Contractor shall submit to the Engineer for approval duplicate blue prints of all stress sheets, and before any shop work is commenced he shall submit duplicate blue prints of shop details and erection diagrams and other drawings made by him. The Con tractor is not to make any alterations to any approved drawing without the authority of the Engineer. After approval the Contractor is to furnish the Railway Company with such additional prints of each drawing as may be required (usually four sets). On the completion of the Contract, the original tracings become the property of, and are to be delivered to the Railway Company. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.